Similar Projects
Tennis Courts/Back of Park Restrooms - City of White House
New Construction, Infrastructure
Conception
$250,000 CJ est. value
White House, TN 37188

Wilderness Resort Indoor Waterpark Expansion
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Sevierville, TN 37876

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

Edition Hotel / Nashville
LEED Certification, New Construction, Infrastructure - 12,050 SF
Design
$170,000,000 CJ est. value
Nashville, TN 37203

149368/149285 Rehabilitate GRSM Sugarlands at Great Smoky Mountain National Park
New Construction, Infrastructure, Renovation - 6,875 SF
Bidding
$10,000,000 CJ est. value
Gatlinburg, TN 37738

Summit Concession Stands and Warner Park and Frost Stadium Concession Stands
New Construction, Infrastructure
Bidding
$323,000 CJ est. value
Chattanooga, TN 37402

Lonas Young RV Park
Renovation
Post-Bid
LaFollette, TN 37766

Freedom Ball Fields
Post-Bid
$3,000,000 to $6,000,000 est. value
Franklin, TN

Avery Johnson Park Pavilion and Restroom
New Construction
Results
Cleveland, TN

Shade Structures
New Construction
Results
Bartlett, Memphis, TN 38133

Puttshack
New Construction, Renovation - 28,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Nashville, TN 37203

405 Broadway Entertainment
New Construction - 35,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Nashville, TN 37203

W.C. Johnson Park Soccer/Football Restroom Renovation - Town of Collierville
Demolition, New Construction, Renovation
Conception
$480,000 CJ est. value
Collierville, TN 38017

Nashville Yards Entertainment Venue
New Construction, Infrastructure - 601,800 SF
Design
$668,000,000 CJ est. value
Nashville, TN 37203

Bethesda Community Center Phase II
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Thompsons Station, TN 37179

Last Updated 01/20/2023 10:38 AM
Project Title

Herbert Holt Park Restrooms and Pavilion Remodel

Physical Address View project details and contacts
City, State (County) Gatlinburg, TN 37738   (Sevier County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Herbert Holt Park Restrooms Questions regarding project specifications may be directed to Parks and Recreation Director, Laurence Evans, 865-436-4990 or LaurenceE@gatlinburgtn.gov. No bid may be withdrawn for thirty (30) days. The Bidder's name, address, bid opening time and the quotation "Herbert Holt Park" must be printed on the sealed envelope containing the bid. The City of Gatlinburg reserves the right to waive any informalities in or to accept or reject any and/or all bids and to accept the bid deemed most favorable to the interest of the City. Summary The Herbert Holt Park Renovation project consists of three separate parts: 1. PARK SITE DEVELOPMENT 2. ARCHITECTURAL RENOVATIONS (pavilion and restroom renovations) 3. RIVERBANK STABILIZATION AND RAMP RESTORATION PARK SITE DEVELOPMENT Including, but not limited to all site work, grading, paving, fencing, site furnishings installation, lighting, utilities, landscape, irrigation, along with any other elements included in the plans and documents. Note: Playground equipment will be installed by Cunningham Recreation through coordination with the general contractor. Below is our proposed scope of work: Men's & Women's Restroom: 1. Demolition Scope: a. Remove existing toilet partitions b. Remove existing vanities & plumbing c. Remove existing mirrors and store to be reinstalled at completion d. Remove existing soap dispenser e. Remove existing toilets and grab bars f. Remove existing baby changing stations g. Remove existing toilet paper dispensers h. Remove existing urinals i. Remove existing hand dryer j. Remove existing lighting k. Remove existing space heater l. Remove restroom doors and trim m. Remove drinking fountain in bathroom hallway 1. Fixtures Scope: a. Install new stainless steel diamond pattern toilet partitions b. Install new stainless steel grab bars c. Install new Bradley GLX 2-Station d. Install new metered Delta Faucets per specification e. Install new Urinal-Zurn Omni-Flow- at ADA compliant height f. Install new Toilets - Zurn w/ Pro Flo accessories - 17" seat height g. Install soap dispenser (provided by City of Gatlinburg) h. Reinstall existing mirrors i. Install new Bobrick - Stainless Steel Baby Changing Stations j. Install new Hand Dryer- World Dryer VERDEdri v2 (Q-973) High SpeedADAHandDryer, HEPA, Brushed Stainless k. Install new Sanitary Waste Receptacles in Women's RR 1. Install new toilet paper dispensers - Vandal Stop Products 2. Walls Scope: a. Furr out existing CMU walls with l x pressure treated and install tile backer boardwheretile applications are to be and moisture resistant gypsumboard above tile. b. Install new wall tile (8x20 Hawthorn or equal) to 48" above FFEon all walls except atthe vanity, tile will go to approximately 80". Tile transitions will be Schluter transitions.Grout to be a standard color selection of TEC Power Grout or equivalent c. Paint all walls with stucco finish paint system 3. Ceiling Scope: a. Frame new ceiling at 8' height above floor grade. b. Install moisture resistant gypsum board to ceiling and paint white. c. Install new lx4 trim board at the transition locations 4. Electrical & Lighting Scope: a. Install new can lighting in ceiling per spec 5. Mechanical a. Install new HVAC unit to supply heat and air conditioning to men's andwomen'srestrooms,andoffice space, including duct, vents and returns.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents