Similar Projects
All One One All - A D'Artagnan Farm
Renovation, Infrastructure
Conception
$400,000 CJ est. value
Goshen, NY 10924

Food Bank of the Hudson Valley Distribution Facility
New Construction, Infrastructure - 40,000 SF
Conception
$10,700,000 CJ est. value
Montgomery, NY 12549

Sunrise Commons/ Tivoli Plaza
New Construction, Infrastructure - 56,100 SF
Design
$35,000,000 CJ est. value
Goshen, NY 10924

Sunrise Commons/ Tivoli Plaza
New Construction, Infrastructure - 56,100 SF
Design
$35,000,000 CJ est. value
Goshen, NY 10924

RFQ D/B - Design-Build Services for the Moodna Viaduct Timber Bridge Ties Replacement
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Salisbury Mills, NY 12577

RFQ D/B - Design-Build Services for the Moodna Viaduct Timber Bridge Ties Replacement
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Salisbury Mills, NY 12577

Construction Management Services for Construction of Medical Examiner`s Office Facility
New Construction - 17,000 SF
Results
Goshen, NY

Cold Milling for 2022
Infrastructure
Results
Newburgh, NY

Gardner Ridge Apartments
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Newburgh, NY 12550

Empire Properties Commercial Building
New Construction, Infrastructure - 18,000 SF
Pending Verification
New Windsor, NY 12553

King Road Solar Farm
New Construction, Infrastructure
Conception
$5,000,000 est. value
Middletown, NY 10941

143 Washington Street
Renovation - 9,000 SF
Design
Newburgh, NY

Remediation and Purchase
Renovation, Infrastructure
Post-Bid
$123,250 CJ est. value
Newburgh, NY 12550

Pavement Repairs at Various Locations
Term Contract, Infrastructure
Results
$3,200,000 est. value

Big Shine Addition
Addition, Demolition, Infrastructure - 9,820 SF
Pending Verification
$1,000,000 CJ est. value
Newburgh, NY 12550

Last Updated 07/03/2023 02:32 PM
Project Title

Warriner Plumbing and Heating

Physical Address View project details and contacts
City, State (County) New Windsor, NY 12553   (Orange County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $6,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 3, 2023, this project is seeking approval from the New Windsor Planning Board. Information regarding an architect and general contractor has not been disclosed. A firm timeline has not been confirmed.

Details

51,400 SF - 51,400 SF. 4,200 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents