Similar Projects
Old Bridge Road/Occoquan Road Intersection Improvement - Prince William County
Infrastructure
Conception
$5,194,000 CJ est. value
Occoquan, VA 22192

Occoquan Greenway - Prince William County
Infrastructure
Conception
$5,000,000 CJ est. value
Occoquan, VA 22125

Chenman - Phase II
New Construction, Infrastructure - 81,650 SF
Design
$16,000,000 CJ est. value
Norfolk, VA 23517

Apartments / Norfolk
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Norfolk, VA 23518

AutoZone #6893 / Woodbridge
New Construction, Infrastructure - 6,500 SF
Bidding
$1,500,000 CJ est. value
Woodbridge, VA 22192

RFP D/B - State-of-the-Art Municipal Solid Waste Sorting Facility
New Construction, Infrastructure
Bidding
$25,000 CJ est. value
Woodbridge, VA 22191

River Star Homes- Residential BMP Construction
Post-Bid
Norfolk, VA

Bridge Maintenance (Sump Pump Installation)
New Construction
Post-Bid
Norfolk, VA 23523

Demolition and Site Restoration - 400 Saint Paul's Boulevard
Results
Norfolk, VA 23510

Subgrade Stabilization
Infrastructure
Results

QTS PW Digital Gateway North & Digital Gateway South
New Construction, Infrastructure - 7,900,000 SF
Pending Verification
$1,200,000,000 CJ est. value
Gainesville, VA 20155

Amazon Data Services / Prince William County
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Manassas, VA 20109

Powells Creek Crossing - Prince William County
Infrastructure
Conception
$9,000,000 CJ est. value
Woodbridge, VA 22191

Williams Mixed Use Development
New Construction, Infrastructure - 45,630 SF
Design
$24,500,000 CJ est. value
Haymarket, VA 20169

Owens House - New Residence Hall - 48th Street Parking
Infrastructure
Bidding
$700,000 CJ est. value
Norfolk, VA 23508

Last Updated 09/14/2022 05:31 PM
Project Title

Berkley Bridge Norfolk Emergency Generator Replacement

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23502   (Norfolk City County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $9,388,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the replacement of the existing Berkley Movable Bridge Emergency Generator, adjacent to Interstate I-264 spans that cross the Eastern Branch of the Elizabeth River located in Norfolk, VA. Work includes but is not limited to the replacement and construction of a new emergency generator building with associated transformer pad and above ground walkway, laying of electrical conduit 2,500 feet long and related electrical and mechanical work. This generator replacement will support future changes to the mechanical and electrical replacement project. A five percent (5%) bid bond is required to accompany this bid. When required bid shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid. Failure to submit the bid bond on the Commonwealth of Virginia Standard Bid Bond, Form CO- 10.2 will result in the bid being considered non-responsive. (When bid bonds are requested, the awarded contractor will be required to furnish Performance and Payment Bond.) Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids. The undersigned understands that time is of the essence and agrees that the time for Substantial Completion of the entire project shall be _720__ consecutive calendar days from the date of commencement of the Work as specified in the Notice to Proceed. Normal working hours shall be 7:00 AM - 3:30 PM Monday - Friday. Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents