Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Limehouse Drive/Multi-Residential
New Construction, Infrastructure
Design
$18,000,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

RFP D/B - Bridge Replacement Program, A Design-Build Project
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Saint George, SC 29477

RFP D/B - Bridge Replacement Program, A Design-Build Project
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Saint George, SC 29477

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

2022 Spring Resurfacing
Infrastructure
Results
Summerville, SC 29483

Reconstruction/Rehabilitation
Infrastructure
Results

Wastewater Treatment Plant Expansion and Improvements
Infrastructure
Construction
$10,000,000 CJ est. value
Summerville, SC 29483

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Last Updated 05/03/2023 07:04 AM
Project Title

Intersection Improvements - US 176(Berkeley County)

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,100,000 [brand] Estimate
Plans Available from Agency's Affiliate - 03/11/23
Owner View project details and contacts
Architect View project details and contacts
Description

SC File NO(S).: 0857131 PCN: P039388 Project No.: P039388 Approx. Length (miles): 0.1570 CO(S).: Berkeley The Contractor's attention is called to the requirements of the SC Department of Transportation for Prequalification. Only contractors who have been issued a prequalification certificate by the sc department of transportation will be allowed to submit bids. Information concerning prequalification can be obtained at the Contracts Administration office, Room 332 in the Headquarters building, 955 Park Street, Columbia, SC, or by contacting Maria Devito at (803)737-2043 or Prequal@scdot.org. Unless otherwise indicated in the advertisement, no proposal will be considered unless accompanied by a bid bond in the amount of 5% of the Approximate bid amount, written by a surety satisfactory to the Department, properly executed in South Carolina Department of Transportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized, the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. No other form of proposal guaranty will be accepted. Visitors are welcome and should sign in at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1249 with all Letting related questions. The south carolina department of transportation reserves the right to reject any or all proposals and waive any technicalities. SCDOT - 030 - Intersection Improvements - US 176(Berkeley County)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents