Similar Projects
Airport Blvd Resurfacing
Post-Bid
Abilene, TX 79604

Southwest Drive Resurfacing
Post-Bid
Abilene, TX 79600

Southern Region Disaster Recovery Support BPA
Results

Street Resurfacing Project on Work Zone S15
Results
$1,559,189 est. value
Abilene, TX 79600

Griffith Road Reconstruction
Post-Bid
Abilene, TX

North 6th Street/Leggett Drive
Results
$1,746,247 est. value
Abilene, TX 79600

Street Resurfacing Project Work Zone N15B and S11A
Infrastructure
Post-Bid
Abilene, TX

T & P Lane Reconstruction Project
Results
Abilene, TX

South 27th Reconstruction Project
Infrastructure
Post-Bid
Abilene, TX 79603

Butternut Street Rehabilitation Project
Results
$2,809,646 est. value
Abilene, TX 79604

John Knox and Village Drive Reconstruction
Results
$926,371 est. value
Abilene, TX 79606

Call Out MBGF Repair
Results
Less than $1,602,224 est. value
TX

Curry Lane - Cedar Run Road - Rolling Green Drive & Turner Plaza Resurfacing
Results
Abilene, TX 79600

Sayles Boulevard Pavement Rehab
Results
$3,450,000 est. value
Abilene, TX 79604

South 23rd Street and Barrow Street Reconstruction Project
Results
Abilene, TX 79604

Last Updated 09/02/2021 02:49 AM
Project Title

FM 3438-Preventive Maintenance

Physical Address View project details and contacts
City, State (County) TX   (Taylor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,442,223
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

104 6009 Removing Conc (Riprap) Sy 16.000 1 104 6054 Removing Concrete(Mow Strip) Lf 707.000 2 105 6019 Removing Stab Base & Asph Pav(14") Sy 486.000 3 134 6001 Backfill (Ty A) Sta 93.000 4 316 6017 Asph (Ac-20-5tr) Gal 20,297.000 5 316 6224 Aggr(Ty-Pb Gr-4 Sac-B) Cy 451.000 6 351 6013 Flexible Pavement Structure Repair(4") Sy 5,500.000 7 354 6021 Plane Asph Conc Pav(0" To 2") Sy 27,230.000 8 360 6004 Conc Pvmt (Cont Reinf - Crcp) (10") Sy 1,251.000 9 429 6002 Conc Str Repair (Epoxy Mortar) Sf 12.000 10 432 6045 Riprap (Mow Strip)(4 In) Cy 252.100 11 438 6001 Cleaning And Sealing Existing Joints Lf 692.000 12 451 6024 Retrofit Rail (Ty Sstr) Lf 898.000 13 467 6004 Set (Replace Pipe Runner) Ea 2.000 14 467 6211 Set (Ty I)(S= 6 Ft)(Hw= 4 Ft)(3:1) (C) Ea 4.000 15 467 6556 Set (Ty Ii) (Des 5) (Cmp) (3: 1) (C) Ea 2.000 16 467 6559 Set (Ty Ii) (Des 5) (Cmp) (6: 1) (C) Ea 2.000 17 496 6099 Remove Str (Rail) Lf 1,599.000 18 500 6001 Mobilization Ls 1.000 19 502 6001 Barricades, Signs And Traffic Handling Mo 8.000 20 506 6038 Temp Sedmt Cont Fence (Install) Lf 808.000 21 506 6039 Temp Sedmt Cont Fence (Remove) Lf 808.000 22 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 780.000 23 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 780.000 24 510 6003 One-Way Traf Cont (Port Traf Sig) Mo 2.000 25 512 6013 Port Ctb (Des Source)(Sgl Slp)(Ty 1) Lf 4,240.000 26 512 6025 Port Ctb (Move)(Sgl Slp)(Ty 1) Lf 4,240.000 27 512 6037 Port Ctb (Stkpl)(Sgl Slp)(Ty 1) Lf 4,240.000 28 514 6001 Perm Ctb (Sgl Slope) (Ty 1) (42 ) Lf 1,599.000 29 530 6004 Driveways (Conc) Sy 9.000 30 540 6001 Mtl W-Beam Gd Fen (Tim Post) Lf 3,012.500 31 540 6006 Mtl Beam Gd Fen Trans (Thrie-Beam) Ea 11.000 32 540 6020 Mtl W - Beam Gd Fen (Low Fill Culvert) Lf 150.000 33 542 6001 Remove Metal Beam Guard Fence Lf 2,487.500 34 544 6001 Guardrail End Treatment (Install) Ea 17.000 35 545 6003 Crash Cush Atten (Move & Reset) Ea 10.000 36 545 6005 Crash Cush Atten (Remove) Ea 4.000 37 545 6007 Crash Cush Atten (Instl)(L)(N)(Tl3) Ea 2.000 38 545 6019 Crash Cush Atten (Instl)(S)(N)(Tl3) Ea 4.000 39 636 6001 Aluminum Signs (Ty A) Sf 360.500 40 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 165.000 41 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T) Ea 22.000 42 644 6027 In Sm Rd Sn Sup&Am Tys80(1)Sa(P) Ea 16.000 43 644 6033 In Sm Rd Sn Sup&Am Tys80(1)Sa(U) Ea 18.000 44 644 6087 In Srss & Am (Rail)(130 Mph)(P Mount) Ea 5.000 45 647 6001 Install Lrss (Struct Steel) Lb 394.000 46 658 6062 Instl Del Assm (D-Sw)Sz 1(Brf)Gf2(Bi) Ea 56.000 47 658 6065 Instl Del Assm (D-Sy)Sz 1(Brf)Gf2(Br) Ea 9.000 48 658 6069 Instl Del Assm (D-Sw)Sz (Brf)Ctb (Br) Ea 10.000 49 658 6071 Instl Del Assm (D-Sy)Sz (Brf)Ctb (Bi) Ea 15.000 50 662 6004 Wk Zn Pav Mrk Non-Remov (W)4"(Sld) Lf 38,970.000 51 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld) Lf 42,610.000 52 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty W Ea 116.000 53 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty Y Ea 240.000 54 666 6006 Refl Pav Mrk Ty I (W)4"(Dot)(100mil) Lf 244.000 55 666 6030 Refl Pav Mrk Ty I (W)8"(Dot)(100mil) Lf 169.000 56 666 6036 Refl Pav Mrk Ty I (W)8"(Sld)(100mil) Lf 7,449.000 57 666 6042 Refl Pav Mrk Ty I (W)12"(Sld)(100mil) Lf 416.000 58 666 6138 Refl Pav Mrk Ty I (Y)8"(Sld)(100mil) Lf 820.000 59 666 6168 Refl Pav Mrk Ty Ii (W) 4" (Dot) Lf 122.000 60 666 6178 Refl Pav Mrk Ty Ii (W) 8" (Sld) Lf 2,184.000 61 666 6182 Refl Pav Mrk Ty Ii (W) 24" (Sld) Lf 1,605.000 62 666 6184 Refl Pav Mrk Ty Ii (W) (Arrow) Ea 17.000 63 666 6192 Refl Pav Mrk Ty Ii (W) (Word) Ea 12.000 64 666 6211 Refl Pav Mrk Ty Ii (Y) 8" (Sld) Lf 40.000 65 666 6214 Refl Pav Mrk Ty Ii (Y) 24" (Sld) Lf 675.000 66 666 6300 Re Pm W/Ret Req Ty I (W)4"(Brk)(100mil) Lf 10,069.000 67 666 6303 Re Pm W/Ret Req Ty I (W)4"(Sld)(100mil) Lf 59,784.000 68 666 6312 Re Pm W/Ret Req Ty I (Y)4"(Brk)(100mil) Lf 5,448.000 69 666 6315 Re Pm W/Ret Req Ty I (Y)4"(Sld)(100mil) Lf 79,322.000 70 668 6076 Prefab Pav Mrk Ty C (W) (24") (Sld) Lf 2,112.000 71 668 6077 Prefab Pav Mrk Ty C (W) (Arrow) Ea 40.000 72 668 6085 Prefab Pav Mrk Ty C (W) (Word) Ea 37.000 73 668 6091 Prefab Pav Mrk Ty C (W) (18")(Yld Tri) Ea 94.000 74 668 6108 Prefab Pav Mrk Ty C (Y) (24") (Sld) Lf 4,623.000 75 672 6007 Refl Pav Mrkr Ty I-C Ea 347.000 76 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 1,398.000 77 672 6010 Refl Pav Mrkr Ty Ii-C-R Ea 991.000 78 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 44,072.000 79 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 2,248.000 80 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 1,359.000 81 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 20.000 82 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 12.000 83 3077 6001 Sp Mixes Sp-B Pg64-22 Ton 286.000 84 3077 6053 Sp Mixes Sp-D Sac-B Pg70-22 Ton 15,420.000 85 3077 6075 Tack Coat Gal 21,029.000 86 6001 6002 Portable Changeable Message Sign Ea 4.000 87 6048 6009 Re Pm W/Ret Req Ty Ii (W)4"(Brk) Lf 280.000 88 6048 6010 Re Pm W/Ret Req Ty Ii (W)4"(Sld) Lf 2,769.000 89 6048 6014 Re Pm W/Ret Req Ty Ii (Y)4"(Sld) Lf 4,188.000 90 6185 6002 Tma (Stationary) Day 406.000 91 6185 6005 Tma (Mobile Operation) Day 24.000 92

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents