Similar Projects
Alamo Ranch Campus
New Construction
Conception
San Antonio, TX 78253

Airport Airfield, Terminals, Ground Access Infrastructure
Renovation, Alteration
Conception
San Antonio, TX

Burbank High School - 2020 Bond - Category 2 - San Antonio Independent School District (SAISD)
New Construction, Renovation, Infrastructure
Design
$19,318,760 CJ est. value
San Antonio, TX 78205

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Hill Country High School
New Construction, Infrastructure - 64,000 SF
Bidding
$22,000,000 CJ est. value
San Antonio, TX 78254

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

2018 Street Bond Projects - Phase II
Infrastructure
Post-Bid
$1,900,000 CJ est. value
Kirby, TX 78219

VMC Asphalt Parking Lots Improvements
Results
San Antonio, TX 78212

Somerset K - Street Phase II Reconstruction
Results
$268,298 est. value
Somerset, TX 78069

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Nicha's Comida Mexicana
New Construction, Infrastructure - 7,805 SF
Pending Verification
$2,000,000 CJ est. value
San Antonio, TX 78214

Alamo Ranch New Elementary School
New Construction
Conception
$45,000,000 est. value
TX

Houston Drive - Universal City Economic Development Corporation
Infrastructure
Post-Bid
Universal City, TX 78148

Northside ISD Lawrence Powell ES Upgrades
Results
$7,590,000 est. value
San Antonio, TX 78238

Clark High School - Fine Arts Replacement- 2022 Bond - Northside Independent School District
New Construction, Renovation, Infrastructure
Conception
$56,900,000 CJ est. value
San Antonio, TX 78249

Last Updated 01/04/2023 03:32 PM
Project Title

Essence Prep School / San Antonio

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78220   (Bexar County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction started December 9, 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 64,388 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents