Similar Projects
Billy Bowlegs Recreation Facility - City of Fort Myers
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Fort Myers, FL 33905

Pine Lake Preserve Stormwater Management - City of Bonita Springs
Infrastructure
Conception
$347,818 CJ est. value
Bonita Springs, FL 34135

The Homes at 81 West
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Fort Myers, FL 33912

Skyline Boulevard Retail
New Construction, Infrastructure - 4,000 SF
Design
$1,000,000 CJ est. value
Cape Coral, FL 33914

Winkler Avenue Right Turn Lane Improvements
Infrastructure
Bidding
$349,000 CJ est. value
Fort Myers, FL 33916

Riverdale Highschool Renovation and Addition Phase IIB
Addition, Renovation, Infrastructure
Sub-Bidding
$45,000,000 CJ est. value
Fort Myers, FL 33905

Wawa #5237 / Fort Myers
New Construction, Infrastructure - 6,421 SF
Post-Bid
$1,400,000 CJ est. value
Fort Myers, FL 33912

Artificial Reef Construction 2022
Infrastructure
Post-Bid
$137,465 CJ est. value
Cape Coral, FL 33909

Iona Drainage District Canal H-7 Drainage, Phase 2
Term Contract
Results
$400,000 est. value
Fort Myers, FL 33901

Construction Of Unimproved Alleys
New Construction, Infrastructure
Results
$600,000 est. value
Cape Coral, FL 33909

Porsche / Fort Myers
Demolition, New Construction, Infrastructure - 67,632 SF
Construction
$700,000 CJ est. value
Fort Myers, FL 33913

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

RV One Superstore of Fort Myers
New Construction, Infrastructure - 30,000 SF
Pending Verification
$6,750,000 CJ est. value
Fort Myers, FL 33905

ADM-76 Nicholas/Country Club Repipe - City of Cape Coral
Infrastructure
Conception
$12,450,000 CJ est. value
Cape Coral, FL 33990

Last Updated 10/18/2023 01:04 AM
Project Title

Whiskey Creek MSTBU Entrance Channel Dredging Project

Physical Address View project details and contacts
City, State (County) Fort Myers, FL 33901   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $520,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Lee County Board of County Commissioners seeks to contract with a qualified CONTRACTOR to provide dredging to the Whiskey Creek Entrance Channel as depicted by the plan view and cross-section. The work shall consist of furnishing all labor, materials, and equipment, and performing all tasks necessary for the dredging of approximately 2,100 cubic yards of material. The material handling, placement, and disposal will be the responsibility of the CONTRACTOR. PARCEL NUMBER: 14-44-24-P2-00013.0000 Questions regarding this solicitation are to be directed, in writing, to the individual listed below using the email address listed below or faxed to (239) 485 8383 during normal working hours. Jake Bond, JBond@leegov.com 1. Order of Work 2. Proposed methodology of execution of work. 3. Vessels and heavy equipment to be used. 4. Number of and qualifications of personnel to be used during construction. 5. Specific methods to be used in establishing horizontal and vertical control and for staking out the Work 6. Documentation to be supplied to the OWNER that shows the material disposal location is properly zoned and made available for use by the property owner to the CONTRACTOR. Any inquiries, suggestions, or requests concerning interpretation, clarification, or additional information pertaining to the solicitation shall be submitted in writing prior to 5:00 PM at least eight (8) calendar days prior to the date when the submission is due. Liquidated Damages: Damages paid usually in the form of monetary payment, agreed by the parties to a contract which are due and payable as damages by the party who breaches all or part of the contract. May be applied on a daily basis for as long as the breach is in effect. Responsive and Responsible: Only bids received from responsive and responsible bidders will be considered. The County reserves the right before recommending any award to inspect the facilities and organization; or to take any other necessary action, such as background checks, to determine ability to perform is satisfactory, and reserves the right to reject submission packages where evidence submitted, or investigation and evaluation indicates an inability for the bidder to perform

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents