Similar Projects
Debris Flow Mitigation Project
Term Contract
Bidding
Orem, UT

Stormwater Runoff and Flood Mitigation Project
Post-Bid
Snowville, UT 84336

Elevated Culvert Cleaning, Inspecting and Lining
Post-Bid
Salt Lake City, UT 84044

Earthwork Removal and Replacement on a Side Slope at the Mexican Hat Disposal Site, Near Mexican Hat, Utah
Results
$500,000 to $1,000,000 est. value
Mexican Hat, UT

40th Street Detention Pond Project
Results
Less than $556,396 est. value
South Ogden, UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Groundwater Mitigation Project
Results
Less than $275,000 est. value
Vernal, UT 84078

Fold and Form Pipe Liner
Term Contract
Post-Bid
Taylorsville, UT 84129

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Construction of the 400 East Storm Drain Rehab Phase 1
Post-Bid
Saint George, UT 84770

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Remove and Replace Approximately 110` of 14" Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Arch Hydroseeding - Salt Wash Soil Stabilization and Revegetation
Results
Moab, UT 84532

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Trail Mountain Emergency Watershed Protection
Results
Castle Dale, UT 84513

Last Updated 07/19/2021 03:47 PM
Project Title

UDOT Wellsville MS4 Project

Physical Address View project details and contacts
City, State (County) Wellsville, UT 84339   (Cache County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Temporary relocation of existing pump house and mag tanks. Demolition of existing wash rack structure and pavements. Installation of new wash rack structure with tie-ins to existing utilities. Installation of new material storage structure. Installation of new brine tank pad. Addition of area inlets and storm drain piping. Installation of new pavement sections. Excavation, grading, and other earthwork are also required as part of the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents