Similar Projects
Glastonbury High School Athletics Facility
Post-Bid
Glastonbury, CT 06033

Construction of Press Box at Dedrick Field
Results
Waterford, CT 06385

Kate Lewis Gym
Renovation
Construction
$348,000 est. value
Farmington, CT 06032

Athletic Training Facility
New Construction - 35,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Haven, CT 06516

Sports Arena
New Construction - 85,000 SF
Construction
$45,000,000 est. value
Fairfield, CT 06824

Dreams Baseball & Softball Academy
New Construction - 8,700 SF
Design
South Windsor, CT

All Sports Village
New Construction - 220,800 SF
Construction
$175,000,000 est. value
Windsor Locks, CT

Veterans Memorial Park Building Renovation
Renovation
Post-Bid
West Haven, CT 06516

Veterans Rally Point
New Construction - 18,000 SF
Conception
$2,500,000 est. value
Norwich, CT 06360

West Rocks Middle School Proposed Soccer Field Complex
New Construction
Results
$1,461,631 to $2,497,087 est. value
Norwalk, CT 06851

UConn Hockey Arena / I-Lot Improvements
New Construction - 97,700 SF
Post-Bid
$53,000,000 est. value
Storrs, CT 06269

Athletic Facility Improvements - East Hampton High School
Renovation
Construction
East Hampton, CT 06424

University Of Saint Joseph Athletic Field Improvements
Renovation
Design
West Haven, CT

Last Updated 12/22/2021 10:53 AM
Project Title

Design-Build Services for Ice Making Equipment

Physical Address View project details and contacts
City, State (County) East Haven, CT 06512   (New Haven County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The concrete rink floor of this original 1971 facility is composed of a steel piping grid, (industry standard at that time) with a secondary anchored concrete slab underneath the cold slab. The secondary slab does not perform as a warm slab. The EHIR has not been available for skating since April 2019 due to an undetermined leak in the ice floor and associated leaking in the cold floor header. The leaking caused a soft, slushy area on the ice surface that if left untreated could create a risk of injury to skaters and hockey players. The existing refrigerant plant at the EHIR was installed in 2009. The plant utilizes R-404a, as its primary refrigerant and ethylene glycol as its secondary refrigerant. The proposed scope of work involves the full removal and replacement of the cold slab, under-slab piping, insulation and ice making equipment in the mechanical room. The new cooling will be an ammonia based refrigerant system.

Details

Athletic Facility, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Ice Rinks.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents