Similar Projects
2019 Large Diameter Water Main Improvements (Rising Main 3 and 4) Project
Bidding
Pittsburgh, PA

Thomas and McPherson Green Infrastructure
Bidding
Pittsburgh, PA 15222

2020 Small Diameter Water Main Replacement Contract A
Post-Bid
Pittsburgh, PA 15222

2020 Small Diameter Water Main Replacement Contract B
Post-Bid
PA

Backwater Valve Maintenance Contract
Results
Pittsburgh, PA

Sewer System Pipe Bursting Repairs
Results
Less than $78,500 est. value
West Mifflin, PA 15122

Backbone Waterline Replacement
Bidding
$250,000 est. value
Sewickley, PA

Furnishing and Delivering Ductile Iron Pipe and Accessories
Post-Bid
Pittsburgh, PA

Pennsylvania Avenue Water Line Replacement
Results
Pittsburgh, PA

Quaker Hollow - Pink House Waterline Replacement
Bidding
Less than $150,000 est. value
Sewickley, PA

Outer Transmission Waterline Loop Project-Phase III
Post-Bid
Brackenridge, PA 15014

Silver Alley Waterline Project
Results
McKeesport, PA 15132

2019 Large Diameter Water Main Improvements Rising Mains 3 and 4 Rising Main 3
Infrastructure
Bidding
Pittsburgh, PA

Private Water Main and Meter Vault Relocation - Allegheny Campus
Post-Bid
$150,000 to $200,000 est. value
Pittsburgh, PA 15233

Garden Terrace North - Rural Court East/West Waterline Replacement Project
Results
Less than $700,000 est. value
Churchill, PA

Reported 05/18/2021 12:00 AM
Project Title

2021 New Texas Road Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Pittsburgh, Plum, PA 15239   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project will encompass but not be limited to the following scope of work: 1. Installation of approximately 7,350' new 12" PVC-C900 Waterline. All PVC Watermain pipe will be purchased by the PBMA and stored at the authority office (4555 New Texas Road) prior to start of work. Contractor will be responsible for the purchasing and installation of all other materials included in the project. 2. Replacement of Service lines, curb stops and corporation stops and associated valves and fittings. 3. New Inter-Connections at Existing Locations. 4. Installation of new fire hydrants and associated valves and mechanical fittings. Removal of abandoned fire hydrant as directed by the engineer. 5. Restoration of all disturbed areas, including fences, walls, steps, sidewalks, lawns. Replacement of disturbed signs and mailboxes. 6. All roadway/pavement restoration. 7. Erosion and Sedimentation Controls. 8. Traffic control during construction. The Owner reserves the right to waive any informality or to reject any or all bids.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents