Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

2021 Asphalt Project Contract I
Results
Dallas, GA

2021 Asphalt Contract 2 Subdivision
Results
GA

2021 Asphalt Contract 3 Subdivision
Results
Dallas, GA

Annual Paving and Concrete Work
Term Contract
Results
Dallas, GA

Mcpherson Church Road Trailhead
Results
Dallas, GA 30132

Burnt Hickory Park Access Improvements
Infrastructure
Results
Dallas, GA 30132

Battlefield Trail Phase 2
Infrastructure
Results
Dallas, GA

Pavement Marking Upgrades on Various County RDS in Paulding County
Infrastructure
Results
GA

Reported 06/01/2022 12:00 AM
Project Title

Arnold Lane Improvement Project

Physical Address View project details and contacts
City, State (County) Hiram, GA 30141   (Paulding County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will involve the milling and paving of Arnold Lane, along water & stormwater improvements, with the possible addition of sidewalks on the east side of Arnold Lane.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents