Similar Projects
Last Updated | 04/15/2021 03:52 PM |
Project Title | Pedestrian Transit Improvements - S. Shanks St and S. Main St. |
Physical Address | View project details and contacts |
City, State (County) | Clute, TX 77566 (Brazoria County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $225,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project is located in Clute, Texas on the east side of S. Shanks St. from Plantation Dr. to 270 ft southeast of Main St. and on the west side of S. Main St. from Plantation Dr. to the southwest corner of Bernard St. (0.55 mi). The Project includes construction of sidewalks, curbs, ramps, driveways, crossings and pavement markings. The following work is included in the Project plans: Removal of existing concrete sidewalk, curb ramps, concrete/asphalt driveways, curb, and limited asphalt pavement, landscaping and tree/plant pruning/removal. Proposed 5-ft wide, 5-in thick concrete sidewalks, curb ramps, crosswalk pavement markings, curb, and limited curb and gutter. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |