Similar Projects
Lake Management Services
Infrastructure
Bidding
Saint Petersburg, FL

Cedarwood and Lyndhurst CMP Replacement and Ditch Stabilization
Infrastructure
Bidding
$589,774 est. value
Dunedin, FL

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Seawall Maintenance, Repair and Related Services
Results
Less than $900,000 est. value
Saint Petersburg, FL 33731

Drainage Improvements for Seventh, and Eighth Street - BMP 5
Results
$240,605 to $298,766 est. value
Belleair Beach, FL 33786

North Highland Avenue Road and Drainage Improvement Phase I
Infrastructure
Bidding
$2,131,000 est. value
Clearwater, FL 33755

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Creek Shoreline Restoration
Results
Less than $600,000 est. value
Saint Petersburg, FL 33711

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Crystal Beach Paving and Drainage Improvements (Pid 002932A)
Results
Less than $1,569,134 est. value
Clearwater, FL

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Drainage - SR 699
Results
$1,783,400 est. value
FL

Last Updated 01/10/2022 01:32 PM
Project Title

Channel 2E Improvements at 101st Terrace

Physical Address View project details and contacts
City, State (County) Pinellas Park, FL 33782   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization/Demobilization, soil erosion and sedimentation control measures, clearing and grubbing, where applicable, excavate the upper 24 inches of the slope face in order to install rip rap flush with the proposed geometry. Excavate the toe of slope for installation for the rip rap footer; install woven geotextile fabric; tree removal and replacement; and install rip rap footer and slope protection. Other improvements include general site improvements associated with the construction such as dewatering, stormwater turbidity control, maintenance of flow in the channel, tree protection, grading, surface restoration, stormwater monitoring and reporting, testing, restoration and site clean-up, maintenance of traffic, utility protection and relocation, and all related work for a complete and operable system.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents