Similar Projects
Security Self Storage Inc
New Construction - 82,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Albuquerque, NM 87109

Design Bid Build Fy20 Nc3 Support War Reserve Material (Wrm), Storage/Shipping Facility, Holloman Air Force Base, Otero County, New Mexico
New Construction, Demolition - 89,945 SF
Design
$10,000,000 to $25,000,000 est. value

Roosevelt County Road Barn
New Construction
Bidding
Portales, NM 88130

Construction of Salt Cinder Storage Facility
Renovation
Bidding
Rio Rancho, NM

U-Haul of Westside
New Construction - 81,509 SF
Post-Bid
Albuquerque, NM 87102

Big Wave Xpress - Storage Building
Addition
Post-Bid
Alamogordo, NM 88310

Waste Transfer Station Building and Systems Remediation
Results
Artesia, NM

General Construction-Metal Building Addition-Berrendo Fire Station
Addition
Results
Roswell, NM 88201

3D Glass New Factory
Renovation - 15,593 SF
Construction
$13,000,000 est. value
Albuquerque, NM 817113

Netflix and ABQ Studios
New Construction - 170,000 SF
Pending Verification
$10,000,000 est. value
Albuquerque, NM

RV Storage - Albuquerque
New Construction - 650 SF
Design
Less than $500,000 CJ est. value
Albuquerque, NM 87121

1st Care of New Mexico
Renovation - 2,295 SF
Post-Bid
Belen, NM 87002

NM Farm and Ranch Heritage Museum Antique Equipment Park
Results
$400,000 est. value
Las Cruces, NM 88011

Westside Vehicle Maintenance/Office Building at Cerro Colorado Road
New Construction - 8,000 SF
Post-Bid
Albuquerque, NM

New Storage Building at the Carlsbad Cemetery
New Construction
Results
Carlsbad, NM 88220

Last Updated 11/23/2020 11:28 AM
Project Title

45` X 40` Building

Physical Address View project details and contacts
City, State (County) Grants, NM 87020   (Cibola County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1.)45’(foot) x 40’(foot) metal building 2.)85 pound per square foot load. slab with code compliant footers 3.)Floor slab to slope 1” (inch) overall from west (high) to east (low) with smooth finish. 4.)Orientation: long axis N/S, high side to east 5.)16’ (foot) height on high side with 1/12 pitch roof single slope to west wall 6.)Roof panels to be caulked at seams with dark brown roof color 7.)Walls and trim to match existing building (white wall with red trim. 8.)26-gauge r-type panels to match existing building. 9.)R-10 insulation, vinyl covered in walls and roof. 10.)Gutters on low roof edge to drain to ground level. 11.)Three (3) each 12’(foot) x 12’ (foot) panel garage doors, insulated placed 18” (inches) from each end with nominal width 36” (inches) between doors on east wall. 12.)Three (3) garage door openers installed to each overhead door. No remote access. 13.)One (1) each 7’(foot) x 3’(foot) outswing metal walk door with combination door handle, on north wall adjacent to existing walk door on existing building. 14.)30-amp 230V sub panel on north wall fed from transfer panel from existing building. 15.)Adjust transfer panel circuits in existing building to accommodate subpanel. 16.)Run propane line from existing tank to feed ceiling mount propane heater. 17.)1 (one) propane heater sized for building installed on north end of building and exhausted through wall. 18.)8 (eight) each 8’(foot) 2 bulb led strip lights 2 each to be placed evenly on north and south end of ceiling close to walls, and 2 each to be placed on both sides of center bay parallel to the long access of the bay. 19.)Double duplex 20a, 120v outlets spaced nominally every 9’(foot) on west wall, and spaced nominally every 12’(foot) on the north and south walls. 20.)2 (two) each exterior led dusk to dawn security lights between garage doors, on door pillars. 21.)1 (one) each motion sensor light at walk through door. 22.)4 (four) each single pole gang switches at walk door to control led lighting in bays. 23.)ADA Compliant ramp positioning will be discussed on site visit.

Details

1 Warehouse/Storage, 1,800 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents