Similar Projects
Berth 46 - Outer Harbor Cruise Terminal AMP - Port of Los Angeles
Infrastructure
Conception
$35,000,000 est. value
Los Angeles, CA

Airport Pond/Sewer Repair - 50358 - City of Chico
Infrastructure
Conception
$448,500 est. value
Chico, CA 95973

Reconstruct Drainage
Infrastructure
Design
$4,164,000 est. value
Willits, CA 95490

Storm Water Mitigation
Infrastructure
Design
$5,056,000 est. value
Placentia, CA 92870

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

2022 Geotechnical Hazard Abatement District (GHAD) Maintenance Services
Infrastructure, Alteration
Bidding
$70,000 est. value
Pleasanton, CA

South Whittier Outfall Relief Trunk Sewer Rehabilitation, Phase 5
Infrastructure
Post-Bid
$8,500,000 to $12,000,000 est. value
Norwalk, CA

Harbor Bay Isle Lagoon Improvements Project
Infrastructure
Post-Bid
$250,000 est. value
Alameda, CA 94502

San Andreas Road PM 1.24 and 1.30 Browns Valley Road PM 2.14 and Mt Madonna PM 0.96 Storm Damage Repair Project
Infrastructure
Results
San Andreas, CA

Sewer Main Spot Repair
Alteration
Results
$650,000 est. value
Whittier, CA 90603

Tidal Barriers and Levee Upgrades
Infrastructure
Conception
$15,000,000 est. value
Corte Madera, CA

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Storm Damage Repair to Thomas Road
Infrastructure
Bidding
$461,200 est. value
Miranda, CA

Maintenance of the Cerritos Sewer System
Alteration
Post-Bid
Cerritos, CA

Interstate 10 Sewer Crossing
Infrastructure
Results
Yucaipa, CA 92399

Reported 07/15/2022 01:38 PM
Project Title

Prince and Dana Street - Storm Drain Improvements - PWENSD2306 - City of Berkeley

Physical Address View project details and contacts
City, State (County) Berkeley, CA 94705   (Alameda County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Stormwater infrastructure installation and connect it to storm drain manhole on Prince & Dana Streets. This project is in included in the City of Berkeley FY 2023-2027 Capital Improvement Plan (CIP). As of July 14, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents