Similar Projects
Salters Creek Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Straits Landing Channel Maintenance Dredging
Post-Bid
Beaufort, NC 28516

Post-Florence Renourishment Project Phase 1
Results
Less than $19,579,550 est. value
Indian Beach, NC

Maintenance Dredging - MHC Inner Harbor
Results
$1,000,000 to $5,000,000 est. value
Morehead City, NC 28557

W912PM20B0012 - Coastal Storm Risk Management Bogue Banks Sources Sought
Post-Bid
$25,000,000 to $50,000,000 est. value
Atlantic Beach, Emerald Isle, Indian Beach, Pine Knoll Shores, Salter Path, NC

Post-Florence Beach Renourishment Project Phase 2
Results
Less than $31,632,750 est. value
Emerald Isle, NC

Coastal Storm Risk Management (CSRM) Bogue Banks, Carteret County, N.C.
Post-Bid
NC

Culvert Replacment/Repair Due to the Effects of Hurricane Florence including Open Graded Friction Course Overlay
Results
NC

CAPE Emerald Subdivision Pond Outlet Structure and Pipe Relocation
Post-Bid
Emerald Isle, NC 28594

South Atlantic Regional Harbor Dredging
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Construction of a 30’ X 6’ Vinyl Retaining Wall and a Set of Steps Leading into Bogue Sound at 24th Street - Hurricane Florence Damages
Post-Bid
Emerald Isle, NC

South Atlantic Division Regional Harbor Dredging Contract FY21
Results
$10,000,000 to $25,000,000 est. value
Brunswick, Savannah, GA - Morehead City, Wilmington, NC

Maintenance Dredging, Morehead City Harbor, Cutoff, Range A and Range B
Results
$10,000,000 to $25,000,000 est. value
Morehead City, NC

Carteret Community College - Shoreline Stabilization Project
Results
Morehead City, NC 28557

Post-Florence Beach Renourishment Project Phase 3
Results
Emerald Isle, NC 28594

Last Updated 08/06/2020 03:02 PM
Project Title

Atlantic Harbor Maintenance Dredging and Living Shoreline

Physical Address View project details and contacts
City, State (County) Beaufort, NC 28516   (Carteret County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,949,188
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists of the maintenance dredging of Atlantic Harbor and construction of a granite rock sill (living shoreline) around the White Point sediment placement facility. Approximately 13,200 CY will be mechanically dredged from the Atlantic Harbor entrance channel and basin. The sediment will be placed on the adjacent White Point peninsula. The project also requires placement of approximately 9,545 tons of Class A granite riprap as a living shoreline. The living shoreline will contain15-ft breaks spaced approximately every 200-ft to allow tidal flushing and fish passage. Engineered wave attenuators will be installed on piles approximately 5-ft seaward of the fish passage breaks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents