Similar Projects
Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Bidding
Verona, WI

Pumping Station 4 Rehabilitation
Post-Bid
Madison, WI

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

Coon Street and Spring Lake Road Lift Station Upgrade
Results
Rhinelander, WI 54501

Pammel Creek Force Main Pig Launching Station
Results
Less than $75,000 est. value
La Crosse, WI

Lift Stations 1 & 10 Generator Buildings
Renovation
Post-Bid
$345,000 est. value
Pewaukee, WI 53072

Sanitary Sewer Pump Station - Frame Park Restroom
Results
Waukesha, WI 53188

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Mannville Lift Station Replacement
Renovation
Results
Marshfield, WI 54449

Lift Station Rehabilitation
Renovation
Post-Bid
Rosholt, WI

Lift Station No. 3 Improvements
New Construction
Results
$625,000 est. value
Wind Lake, WI 53185

Sanitary Sewer Improvements
Renovation, Infrastructure
Post-Bid
Rock Springs, WI

Tiedeman Pond Lift Station Upgrades
Results
$600,000 est. value
Middleton, WI

Museum Place Storm Lift Station
Results
Green Bay, WI

Greenville STH 76 - Force Main and Lift Station No.1 and No.2 Improvements, Contract I-20
Results
Greenville, WI 54942

Last Updated 10/01/2021 10:34 AM
Project Title

National Avenue Booster Pump Station Upgrade

Physical Address View project details and contacts
City, State (County) New Berlin, WI 53151   (Waukesha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $429,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of two new booster pumps in the existing building, new reservoir overflow structure, and the recoating of existing interior piping and equipment. The work also includes removal the existing buried pumps, connection to the existing 8-inch main at National Avenue, and the installation of water main to the building. Additional items included are the related sitework improvements, piping modifications, electrical, instrumentation/controls, and other ancillary work required to complete the improvements.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents