Similar Projects
Bear Lake RV Resort
New Construction
Design
Garden City, UT 84028

Autocamp Zion
New Construction - 8,441 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Virgin, UT 84779

Asphalt Running Track - Glendale Middle School
New Construction
Bidding
$575,000 est. value
Salt Lake City, UT 84104

Davis County Driving Range
New Construction
Bidding
$100,000 est. value
Kaysville, UT 84037

Bingham Creek Regional Park Phase 2
Post-Bid
Salt Lake City, UT

Sunnyvale Park Improvements
Post-Bid
$300,000 to $400,000 est. value
Millcreek, UT

Herriman High Track Resurface
Results
$400,000 to $500,000 est. value
Herriman, UT 84096

Payson High School Rebuild and Maple Mountain High School Football Stadium and Track Renovation
Results
$90,000,000 est. value
Payson, UT 84651

Salem Hills High School Track and Field Replacement
Construction
Salem, UT

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Bout Time Pub and Grub
New Construction, Renovation
Pending Verification
Sandy, UT 84070

Seasons Amenities
New Construction - 1,660 SF
Design
$500,000 to $1,000,000 CJ est. value
Garden City, UT 84028

Phase 3 Baffle Replacement - Lee Kay Shooting Range
New Construction
Bidding
$410,000 est. value
Salt Lake City, UT 84128

Pickleball Court Construction Project
Post-Bid
Sandy, UT 84070

2020 800 North 1100 East Mini Park Project
Results
$82,200 to $90,500 est. value
Orem, UT 84057

Last Updated 05/05/2022 02:00 PM
Project Title

DFCM Construction-DNR Jordanelle State Park Campground and Beach Expansion

Physical Address View project details and contacts
City, State (County) Heber City, UT 84032   (Wasatch County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes construction at both Ross Creek Day Use Area and Rock Cliff Campground. Ross Creek Day Use Area includes a new entry station, new beach area, beach pavilions and other day use pavilions and tables. Rock Cliff includes a new campground with 17 new van camping sites, 25 new RV camp sites and improvements to 9 existing tent pad sites. Two new ranger residences will be constructed along with two new restrooms, a maintenance shed, a laundry facility, and renovations of two existing restrooms and an existing pavilion. Estimate - ($1,530,000 Ross Creek / $9,170,000 Rock Cliff)

Details

Misc. Recreational, New Construction, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents