Similar Projects
North Shore Terminal Reservoir Phase 2 Expansion Project
Renovation
Design
Orem, UT

Kolob Canyons Water Tank & Distribution
Post-Bid
$1,000,000 to $5,000,000 est. value
New Harmony, UT 84757

Zone D - 5 Million Gallon Tank
Post-Bid
$5,000,000 to $6,000,000 est. value
Salt Lake City, UT

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Repair of Sewage Lift Pumps and Septic Tanks
Term Contract
Post-Bid
Price, UT

TLWID Water Improvements Project 2019
Results
Less than $850,000 est. value
Lapoint, UT 84039

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Culinary Water Improvements for Elsinore Town
Results
Less than $2,000,000 est. value
Elsinore, UT 84111

Boulder Farmstead Water Company Water Tank
Post-Bid
Less than $510,000 est. value
Boulder, UT 84716

Zone 2 Secondary Water Storage Reservoir
Results
Less than $1,000,000 est. value
Magna, UT 84044

Four (4) 1,000 Gallon Propane Tanks
Post-Bid
Blanding, UT 84511

Cathodic Protection Services
Results
Sandy, UT

Automated Brine Maker System With Vertical Storage Tanks
Post-Bid
Orem, UT 84057

Canyon Meadows Water System Improvements
Results
Less than $2,000,000 est. value
Springville, UT

Last Updated 04/21/2021 11:11 AM
Project Title

Upper Spring Creek Tank Rehabilitation Part 2

Physical Address View project details and contacts
City, State (County) Springville, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish and Install Stainless Steel Support Brackets on wall of existing concrete tank to provide support to existing precast double tee roof support members. Post install two 10” roof vents on existing roof. Coordinate with a second contractor during installation who will be doing some concrete repair work on the outside corners of the tank (contractor is already selected and will need access to inside of tank to set form work). Clean and disinfect tank after all work is complete.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents