Similar Projects
Grandville Phase 1 And Phase 2 Infrastructure Project
Infrastructure
Bidding
South Jordan, UT

Zone 6 Highway Junction Reservoir 2
Infrastructure
Bidding
$4,700,000 to $5,100,000 est. value
West Jordan, UT 84088

Grasmere Park Site Improvement Project
Infrastructure
Post-Bid
West Valley City, UT 84119

Juniper Canyon Recreation Area (JCRA) Eastern Trailhead
Infrastructure
Post-Bid
Herriman, UT

Airport Glycol Plant / Wildlife Office Space
Results
Less than $3,170,000 est. value
Salt Lake City, UT 84116

New Cyprus High School, Earthwork
Results
Magna, UT

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Sunroc Block Plant Landscaping
New Construction
Construction
Bluffdale, UT 84065

Reclamation Construction for Overland 2 Project
Results
Less than $350,000 est. value
Salt Lake City, UT

Costco
New Construction
Construction
Riverton, UT 84065

Delong Street And Parks and Public Lands Storage Yard Improvements
Results
Salt Lake City, UT

Site Improvements at Taylorsville High School for Relocatable Classroom Buildings
Infrastructure
Results
Taylorsville, UT 84123

Blakes Lambing Ground Guzzler Excavation
Infrastructure
Results
Salt Lake City, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Salt Lake International Airport Ga Zone 3 Corporate Hangar Site Development
Infrastructure
Results
$1,213,237 est. value
Salt Lake City, UT

Reported 03/10/2022 12:00 AM
Project Title

Rocky Ridge Park Site Improvement Project

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84118   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from Municipal Agency - 02/17/22
Owner View project details and contacts
Architect View project details and contacts
Description

The complete construction of a new city neighborhood park Includes site clearing and grubbing, excavation and earth work, rough grading, top soil screening, irrigation system installation with controller, top soil placement, finish grading, sod/hydro-seed/drill seed turf, trees, shrubs, groundcover, concrete flatwork, concrete curbing, concrete retaining walls, pre-fabricated pavilion installation, playground installation, impact material installation, drainage system installation, lights and light piers, electrical system, electrical service, drinking fountain and park sign.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents