Similar Projects
RiNo Art District
Renovation
Conception
Denver, CO 80205

Promenade at Castle Rock
New Construction
Conception
Castle Rock, CO

Watershed
New Construction, Build-Out - 180,000 SF
Design
$72,000,000 est. value
Denver, CO 80216

Harvard Gulch West Trail (Elevate Denver Bond)
Design
Denver, CO

2021 Town Park Phase 1B Improvements Project
Renovation
Bidding
Dillon, CO 80435

Town Park CM/GC
New Construction
Bidding
Snowmass Village, CO

Mercy Housing
New Construction - 132,700 SF
Sub-Bidding
Denver, CO 80220

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

Rawlings Sports Complex Renovation
Post-Bid
Pueblo, CO 81001

Foxridge Park Improvements
Results
Less than $240,000 est. value
Centennial, CO 80122

(Idlewood) Idlewild Park Playground Installation: Design-Build Services
Results
Lakewood, CO 80215

Basalt River Park - Phase I & II
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Basalt, CO 81621

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Construction
Less than $5,350,000 est. value
Erie, CO 80516

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Fisher Farm Subdivision
New Construction
Pending Verification
Timnath, CO 80731

Last Updated 07/26/2021 11:56 AM
Project Title

Design Build Services for Cottonwood Park Playground Replacement Project

Physical Address View project details and contacts
City, State (County) Louisville, CO 80027   (Boulder County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes: (1) assistance with design services; (2) construction document preparation services; (3) prep graphics for public outreach / stake holder meetings; (4) demolition and removal of the existing playground and playground components. (5) site work and grading; (6) utility coordination and protection; (7) Construction/installation of site and playground elements that are creative, inviting and suitable for children 2-5 years of age and also for children 5-12 years of age. Elements may include but are not limited to, poured in place safety surfacing, wood fiber, play equipment, site furnishings concrete, concrete curbing and flatwork; (8) site cleanup and restoration. The preferred design will need to address all items needed to implement the demolition and renovation of the playground such as ADA accessibility, pedestrian safety, circulation and drainage.

Details

Park/Playground, New Construction.
Division 02 - Existing Conditions, Demolition.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents