Project Title | Filter Backwash Retention Tank Alternate Discharge |
Physical Address | View project details and contacts |
City, State (County) | Fort Wayne, IN 46802 (Allen County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $840,310 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The funding source for this project is Water State Revolving Fund. The Contractor shall furnish all labor. Insurance, equipment, materials and power for the complete performance of the following project. Filter Backwash Retention Tank Alternate Dis- charge as follows: Installation of a horizontal direction drilled HDPE pressurized discharge from filter backwash water retention tank pumps to a combined storm/sanitary sewer, along with the installation of an owner-furnished flow meter, control valve, and separate metering vault, including all associated pipe, valves, and other appurtenances. all in accordance with the Bidding Documents as prepared by the City Utilities Engineering Department, City of Fort Wayne, Indiana. No Bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City of Fort Wayne, Indiana, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City, or is engaged in litigation with the City. No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. 7% MBE ; 5% WBE |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |