Similar Projects
Water Utility Improvements Division "C" New Water Distribution System
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Eaton, IN 47338

Morningstar Road Project
Infrastructure
Bidding
$899,752 CJ est. value
Auburn, IN 46706

Hardy Lake Dam Valves Replacement
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Scottsburg, IN 47170

Residential Energy Conservation Services
Renovation, Infrastructure
Post-Bid

Residential Energy Conservation Services
Renovation, Infrastructure
Post-Bid

Plumbing Fixture Upgrades
Alteration
Results
New Haven, IN

Huntertown Elementary School Plumbing
Alteration
Results
$215,000 est. value
Huntertown, IN 46748

Park Road and 200 West Water Main
Infrastructure
Construction
$371,319 CJ est. value
Greensburg, IN 47240

Foraker, Southwest and Tecumseh Wastewater Project
Infrastructure
Bidding
$300,000 CJ est. value
Goshen, IN 46526

Batchelor Middle School Mechanical, Plumbing and Control Upgrades
Alteration
Post-Bid
Bloomington, IN 47403

Plumbing Repair
Alteration
Results
Nashville, IN

Plumbing Services at the James Hunter Building
Alteration
Post-Bid
East Chicago, IN 46312

Mount Vernon Transportation Center MEP
Alteration
Results
IN

Plumbing, Mechanical, Electrical Work for the New Mt. Vernon Elementary School
Alteration
Post-Bid
Fortville, IN

Rehabilitation and Repainting of the Dubois Co. 4-H/Park Existing 200,000 Gallon Elevated Water Storage Tank
Infrastructure
Results
$135,200 CJ est. value
Saint Anthony, IN 47575

Last Updated 01/11/2023 10:08 AM
Project Title

Filter Backwash Retention Tank Alternate Discharge

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46802   (Allen County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $840,310 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The funding source for this project is Water State Revolving Fund. The Contractor shall furnish all labor. Insurance, equipment, materials and power for the complete performance of the following project. Filter Backwash Retention Tank Alternate Dis- charge as follows: Installation of a horizontal direction drilled HDPE pressurized discharge from filter backwash water retention tank pumps to a combined storm/sanitary sewer, along with the installation of an owner-furnished flow meter, control valve, and separate metering vault, including all associated pipe, valves, and other appurtenances. all in accordance with the Bidding Documents as prepared by the City Utilities Engineering Department, City of Fort Wayne, Indiana. No Bid will be accepted from, or contract awarded to any person, firm, or corporation that is in arrears to the City of Fort Wayne, Indiana, upon any debt or contract, or, who has failed to execute, in whole or in part in a satisfactory manner, any contract with the City; or, who is a defaulter as to surety or otherwise, upon any obligation to the City, or is engaged in litigation with the City. No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or with the Instructions to Bidders. The Board also reserves the right to waive any defect in any bid. 7% MBE ; 5% WBE

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents