Similar Projects
SE Des Moines Pump Station Rehab
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Des Moines, IA

Municipal Water Well Construction
Infrastructure
Bidding
Dayton, IA 50530

Elk Creek Development Irrigation Well
Term Contract
Post-Bid
Sioux City, IA 51101

Water System Improvements - Well 1
Infrastructure
Post-Bid
Wahpeton, IA 51360

Madison Street Jordan Well Plugging
Alteration
Results
Iowa City, IA

Coralville Well 10 Recasing 2021
Infrastructure
Results
$575,000 est. value
Coralville, IA

WPC CAS Wet Well Pumping Improvements
Infrastructure
Results
$3,500,000 est. value
Cedar Rapids, IA

2021 AMU Clearwell Rehabilitation
Infrastructure
Results
$458,650 est. value
Atlantic, IA 50022

2021 Well Rehabilitation Phase 2
Infrastructure
Results
Waukee, IA

Demolish and Remove Stilling Well
Term Contract
Results
$25,000 to $100,000 est. value
Ottumwa, IA

ERP Pump Rebuild
Infrastructure
Results
Cedar Rapids, IA

Water System Improvements - Shallow Well 7
Infrastructure
Results
Huxley, IA

Water System Improvements - Well No. 9 and 10
Infrastructure
Results
Shelby, IA

Well 5 Improvements
Infrastructure
Results
Tiffin, IA

2021 Water Supply Well
Infrastructure
Results
$185,000 est. value
Audubon, IA

Reported 04/02/2022 12:00 AM
Project Title

Renderer Seal Replacement and Rebuild

Physical Address View project details and contacts
City, State (County) State-Wide: IA
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall perform all necessary labor to remove existing mechanical seals and replace with USDA provided Chesterton, exact match seals. All steps taken by contractor shall be performed by Chesterton trained and certified installers and shall follow the Chesterton manufacturer’s recommendations and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents