Similar Projects
US 101/Schaerer Creek to Hood Canal - Remove Fish Barrier
Infrastructure
Conception
$2,661,000 CJ est. value
Cosmopolis, WA 98537

SR 105/S of Fairmount Ave - Culvert Replacement
Infrastructure
Conception
$2,945,000 CJ est. value
Aberdeen, WA 98520

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

US 12/Satsop River Bridge EB - Bridge Painting
Renovation, Infrastructure
Design
$4,410,000 CJ est. value
Aberdeen, WA 98520

McBryde Sidewalk - Calder to Satsop
Infrastructure
Bidding
$575,000 CJ est. value
Montesano, WA 98563

Bus Wash Facility Improvements
Renovation, Infrastructure
Bidding
$900,000 CJ est. value
Hoquiam, WA 98550

Summit Pacific Medical Center (SPMC) Expansion / Renovation 50% CD Budget
Addition, Demolition, Build-out, Renovation, Infrastructure - 36,000 SF
Sub-Bidding
$10,000,000 CJ est. value
Elma, WA 98541

Forest Road Bridge
New Construction
Post-Bid
$750,000 est. value
Montesano, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

OR Strategic Bridge Preservation 21-23 Bridge Deck Patching
New Construction, Infrastructure
Results
$1,000,000 to $1,250,000 est. value

US 101 / Hoquiam River Riverside Bridge - Machinery Room
Demolition, Infrastructure
Results
WA

Satsop Haul Road Emergency Erosion Protection
Infrastructure
Construction
$305,312 CJ est. value
Aberdeen, WA 98520

US 101/Chicken Coop Creek - Remove Fish Barrier
Infrastructure
Design
$2,472,000 CJ est. value
Cosmopolis, WA 98537

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

New Municipal Building REBID
New Construction, Infrastructure - 6,045 SF
Results
$2,915,000 CJ est. value
Cosmopolis, WA 98537

Last Updated 07/25/2023 02:57 PM
Project Title

Replacement of an Existing Pedestrian Trail Bridge

Physical Address View project details and contacts
City, State (County) Central Park, WA 98520   (Grays Harbor County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of an existing pedestrian Trail Bridge over a channel of the West Fork of Sylvia Creek The replacement bridge is 36 feet long by 6 feet wide. This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for 14 days from the date below.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents