Similar Projects
3rd East Phase II - Marcus to Artesian Basin Water Transmission Pipeline
Infrastructure
Bidding
$200,000 est. value
Salt Lake City, UT 84111

River Bottom Improvement Project Prequalification
Post-Bid

2021 Deer Ridge Waterline Cathodic Protection
Infrastructure
Post-Bid
Draper, UT 84020

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Rushton Groundwater Treatment Plant Filter Vessel
Results
Salt Lake City, UT 84170

Heritage Park Interactive Water Feature
Infrastructure
Post-Bid
South Jordan, UT 84095

Page Sharmel Water Improvements Project
Results
Less than $1,611,164 est. value
Salt Lake City, UT

Upper Conduit Repair - Construction Phase 1
Infrastructure
Post-Bid
$1,287,262 est. value
Salt Lake City, UT

Milford City Water Improvement Project
Results
Less than $5,000,000 est. value

Construction of the Redwood Road 2021 Improvements
Infrastructure
Post-Bid
Taylorsville, UT

11800 South Water Meter / PRV Vault Project
Results
Riverton, UT

Meadowbrook Golf Course Waterline Replacement
Infrastructure
Post-Bid
Taylorsville, UT

2021 Leak Detection Program
Results
West Valley City, UT

Traverse Transmission Line Improvement Project
Infrastructure
Post-Bid
Draper, UT

Directional Drilling Service for Forge
Results
Salt Lake City, UT

Last Updated 06/02/2022 12:57 AM
Project Title

2022 Waterline

Physical Address View project details and contacts
City, State (County) Sandy, UT   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule 1 - Sandy Woods Base Bid The Sandy Woods Lane Project includes creating a looped system for the Sandy Woods area. A new 8" PVC transmission line is to be added by connecting to an old Sandy/Midvale City interconnect on the south end of 700 East near Orchard Vista Ct. The transmission line will be constructed within Midvale City limits from the connection point, along 7570 South, 520 East and 7500 South to Sandy Woods Lane. Construction requirements within Midvale will need to meet Midvale City and APWA standards as indicated within the construction drawings. In addition to constructing a transmission line, the Sandy Woods Lane project includes replacing the existing waterline with a new 8" PVC waterline as shows in the construction drawings. The existing waterline is to remain in service in segments until the new water line has been tested and disinfected and ready for service to minimize the impact to the residents. The project include adding, replacing, and/or reconnecting existing fire hydrants, meters, connections to side main waterlines, service laterals, and valves as indicated on the project's construction drawings. Alternative 1 - As an additive alternative, pricing is requested to replace 3/4" services. The base bid for 3/4" services is to include installing a new lateral and reconnecting the existing meters. The additive alternate bid would be to replace the meter box and setter while reusing the existing meter. Schedule 2 - 300 West Base Bid The 300 West waterline project spans from 9400 South to 9120 South and consists of replacing the existing waterline with a new 12" PVC waterline. The existing waterline is to remain in service until the new water line has been tested and disinfected and ready for service to minimize the impact to the businesses along 300 West. The project includes adding, replacing, and/or reconnecting existing fire hydrants, meters, connection to side main waterlines, service laterals, valves, and fire lines as indicated on the project's construction drawings. Additive Alternate 2-1 (Service Replacement) As an additive alternate, pricing is requested to replace 3/4" and 1" services. The base bid for 3/4" and 1" services is to include installing a new lateral and reconnecting the existing meters. The additive alternative bid would be to replace the meter box and setter while reusing the existing meter. Schedule 3 - Sunburn Lane Base Bid The Sunburn Lane waterline project consists of replacing the existing waterline with a new 8" Ductile Iron Pipe waterline along Sunburn Lane and Cherry Creek Drive. The existing waterline is to remain in service in segments as needed until the new water line has been tested and disinfected and ready for service to minimize the impact to the residents. The project includes adding, replacing, and/or reconnecting existing fire hydrants, meters, and connections to side main waterlines, service laterals, and valves as indicated on the project's construction drawings. Additive Alternate 3-1 (Service Replacement) As an additive alternative, pricing is requested to replace 3/4" services. The base bid for 3/4" services is to include installing a new lateral to and reconnecting the existing meters. The additive alternative bid would be to replace the meter box and setter while reusing the existing meter. Schedule 4 - 10600 South Base Bid The 10600 South waterline project spans from Holiday Park Drive to State Street and consists of replacing the existing waterline with a new 10" and 12" PVC waterline. The existing waterline is to remain in service until the new water line has been tested and disinfected and ready for service to minimize the impact to the businesses along 10600 South. The project includes adding, replacing, and/or reconnecting existing fire hydrants, meters, connections to side main waterlines, service laterals, valves, sample tap, and fire lines as indicated on the project's construction drawings. Work within the State Street intersection was required to be completed no later than June 1, 2022. In order to ensure that the work was completed on time, this portion of the project was removed from the scope of this project and will be installed by others ahead of awarding this contract. The awarded contractor for this project will connect to a the end of a temporary dogleg connection outside of the UDOT right-of-way as shown in the drawing details tocontinue the line down 10600 South. Additive Alternate 4-1 (Service Replacement) As an additive alternative, pricing is requested to replace 3/4" and 1" services. The base bid for 3/4" and 1" services is to include installing a new lateral and reconnecting the existing meters. The additive alternative bid would be to replace the meter box and setter while reusing the existing meter. Additive Alternate 4-2 (Mill and Overlay) The following scope of work defines the additive alternative to mill and overlay 10600 South. Scope: 10600 South Mill and Overlay (I-15 to State Street).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents