RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Utilities - US 60
Infrastructure
Design
$530,000 est. value
Enid, OK

Reconstruct Runway 13/31
Infrastructure
Bidding
$200,000 CJ est. value
Enid, OK 73701

Pacer Softball Fieldhouse
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Enid, OK 73703

Kaw Lake Water Supply
Infrastructure
Post-Bid
Enid, OK 73703

Utility Relocation Gate Valves
Infrastructure
Post-Bid

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

Enid Public Schools Pacer Softball Fieldhouse
Demolition, New Construction, Infrastructure
Bidding
$600,000 CJ est. value
Enid, OK 73703

Water Service Line Material Identification
Infrastructure
Post-Bid
Enid, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

1000-1600 Block East Pine Avenue Waterline Relocation
Results
Enid, OK 73701

1600-1900 Block East Birch Avenue Water Line Relocation
Results
OK

100-500 Block West Elm Waterline Relocation
Infrastructure
Results
Enid, OK

Last Updated 08/18/2022 05:10 PM
Project Title

Sanitary Sewer System Improvements

Physical Address View project details and contacts
City, State (County) Covington, OK 73730   (Garfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Funding for this project is provided through the Clean Water State Revolving Fund (CWSRF) program. As such, compliance with the Davis Bacon Act, American Iron and Steel, and Labor Standards Contract Provisions is mandatory. All bids received at said time will be opened and evaluated for completeness and correctness. All work shall be performed and all construction and materials used and furnished shall be in accordance with the Plans and Specifications prepared by ____Myers Engineering__, and on file in the office of Town of Covington. Each bidder shall accompany his original bid, filed with the Town of Covington, with a certified or Cashier's Check on a solvent bank located in Oklahoma, or a Bidder's Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said Plans and Specifications, and furnish the required bonds according to the Public Competitive Bidding Act of 1974. A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner will retain the deposit for liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a sworn statement in writing that the bidder has not directly or indirectly entered into an agreement, expressed or implied, with any other bidder concerning the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. Construction, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price are required for this project. These bonds must be obtained from a Corporate Surety licensed in Oklahoma and approved by the Owner and Consulting Engineer. The bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the office designated in the solicitation by the time specified in the solicitation. Any proposal, modification, or revision received at the office designated in the solicitation after the exact time specified for receipt of offers is "late" and will not be considered. The contract is to be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to correct any non-material clerical errors in the bidding as allowed under Oklahoma Law. The Owner reserves the right to reject any and all bids in accordance with the Oklahoma Public Competitive Bidding Act of 1974. Conditional bids shall not be accepted.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents