Similar Projects
Freshwater Mussel Survey and Aquatic Species Resource Relocation Services
Term Contract
Bidding
Waco, TX

Lake Granbury Two-Slip Floating Boathouse Replacement
Bidding
Granbury, TX 76048

Riverside Park Boat Ramp Improvements
Post-Bid
Bay City, TX 77414

Hazel Bazemore Park Boat Ramp Rehabilitation Project Phase II
Post-Bid
Corpus Christi, TX 78401

Aransas Boat Ramp Removal & Replace
Results
$95,000 to $105,000 est. value
TX

LAMR Add Slips to Dock at Sanford Yake
Results
Fritch, TX

Alabama Street Terminal Repairs - Phase II: Dock Fender Rehabilitation
Post-Bid
Orange, TX 77631

Aransas-Design/Build Boardwalk
Results
$250,000 to $500,000 est. value
TX

Lake Houston Boat Ramp Replacement Services
Post-Bid
Houston, TX 77251

Anahuac-Boardwalk Renovation-Shoveler Pond
Results
$75,000 to $82,000 est. value
Anahuac, TX

Keith Lake Boat Ramp Modification
Post-Bid
Beaumont, TX 77701

New Oil Dock 22 Marine Terminal
New Construction
Results
Corpus Christi, TX

Southeastern Freight Lines
Renovation
Post-Bid
El Paso, TX 79907

Lake Limestone Park 5 Loading Dock
Results
Waco, TX 76714

Construction Services for Perry R Bass Marine Fisheries Research Station
Post-Bid
Palacios, TX 77465

Reported 12/05/2020 12:00 AM
Project Title

Derelict Vessel Removal Services

Physical Address View project details and contacts
City, State (County) Austin, TX 78701   (Travis County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Marine contractor(s) to remove, transport, and complete proper disposal of the derelict vessels along the entire Texas coast located within counties that declared a disaster as a result of Hurricane Harvey. ("Project"). The Project will encompass the entire Texas coast with five coastal regional specific vessel priority lists. Respondent may submit a proposal for one or multiple coastal regional specific vessel priority lists in their entirety. The HUB Goal for this Procurement is 26.0% of the Total Contract Value.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents