Similar Projects
Pearland Surface Water Plant
Post-Bid
Less than $100,000,000 est. value
Pearland, TX 77853

Construction of Water Plant Expansion
Post-Bid
TX

Water Plant No. 2
Results
Less than $4,759,750 est. value
TX

Water Plant Number 1 Motor Control Center Replacement and New Building
New Construction
Results
$796,000 est. value
Houston, TX 77069

Repair and Replacement Services at the North Water Treatment Plant
Post-Bid
Mission, TX 78572

Water Plant Nos. 1 and 2
Results
$1,000,000 est. value
Caldwell, TX 77836

AMIS Rehab Water System
Post-Bid
$1,000,000 to $1,500,000 est. value
San Antonio, TX

Water Supply Plant No. 2 to Serve Brazoria County
New Construction
Results
TX

Construction of Water Plant No. 1 - Phase 1
Post-Bid
TX

Water Treatment Services
Results
$20,000 est. value

1.8 MGD Wastewater Treatment Plant Headworks Platform and Ladder
Addition
Results
Katy, TX

Reported 07/23/2021 12:00 AM
Project Title

Wylie WTP Project No. 517 Phase I

Physical Address View project details and contacts
City, State (County) Wylie, TX   (Collin County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager - 06/01/21
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 is to provide the major reconstruction of two (2) 4-million-gallon cast-in-place concrete clear wells, installation of two (2) new meter vaults with magnetic flow meters, isolation valves and new wash water and plant water pumps. As well as the reconstruction of a pump station inlet flume, the addition of chemical injection points, sampling stations, and chlorine injectors, including associated piping, valves, electrical, instrumentation and control work.

Details

Water Treatment Plant, Addition.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 22 - Plumbing.
Division 26 - Electrical.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Water Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents