Similar Projects
45th Street Watermain Extension - W-036 - City of Elmo
Infrastructure
Conception
$400,000 est. value
Lake Elmo, MN 55042

Phase 3 Regional Drainage Improvements - SW-002 - City of Elmo
Infrastructure
Conception
$500,000 est. value
Lake Elmo, MN

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

Radio Drive to Interlachen Parkway / Woodbury
Infrastructure
Design
$2,425,856 CJ est. value
Woodbury, MN 55125

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Highway 36 and Manning Avenue Interchange
Results
MN

2021 Pavement Improvements
Infrastructure
Results
Forest Lake, MN

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

Metro Gold Line Bus Rapid Transit (GBRT)
New Construction, Infrastructure
Construction
$247,954,230 CJ est. value
Saint Paul, MN 55101

RFP Design - Lake Elmo Park Reserve Swim Pond Recreation Area Improvements
New Construction, Infrastructure, Renovation
Pending Verification
$4,390,000 CJ est. value
Lake Elmo, MN 55042

RFP Design - Lake Elmo Park Reserve Swim Pond Recreation Area Improvements
New Construction, Infrastructure, Renovation
Pending Verification
$4,390,000 CJ est. value
Lake Elmo, MN 55042

New or Refurbished Ballfields - PR-017 - City of Elmo
Infrastructure
Conception
$1,000,000 CJ est. value
Lake Elmo, MN 55042

Preserve Trail Development / Woodbury
Infrastructure
Design
$5,184,990 CJ est. value
Saint Paul, MN 55125

Saint Croix Riverbank Stabilization and Riverwalk
Infrastructure
Post-Bid
Stillwater, MN

Last Updated 01/26/2023 07:07 PM
Project Title

CR 65 Reconstruction

Physical Address View project details and contacts
City, State (County) West Lakeland, MN 55082   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $9,415,803 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Major Quantities include: Clearing and Grubbing 275 Each, Clearing and Grubbing 6.4 Acre, Remove Bituminous Pavement 81,872 Sq Yd, Excavation-Common 69,566 Cu Yd, Excavation-Subgrade 45,001 Cu Yd, Select Granular Embankment (CV) 61,604 Cu Yd, Common Embankment (CV) 33,323 Cu Yd, Aggregate Base (CV) Class 5 17,508 Cu Yd, Bituminous Mixtures 22,971 Ton, 18" CAS Pipe Culvert 1,448 Lin Ft, RC Pipe Culvert Des. 3006 (18"-48") 1,273 Lin Ft, RC Pipe Sewer Des. 3006 (12"-36") 4,011 Lin Ft, Casting Assembly 33 Each, Const. Drainage Structure Des. 48-4020 124 Lin Ft, Concrete Curb & Gutter Design B424 5,032 Lin Ft, 6" Concrete Driveway Pavement 730 Sq Yd, Portable Precast Con Barrier Des 8337 13,131 Lin Ft, Portable Prec Con Barrier Des 8337 - Anchored 3,068 Lin Ft, Traffic Barrier Design Type 31 1,850 Lin Ft, Temporary Impact Attenuator 67 Assembly, Filter Topsoil Borrow 1,483 Cu Yd, Common Topsoil Borrow (CV) 17,419 Cu Yd, Rolled Erosion Prevention Category 20 94,853 Sq Yd, Interim Pavement Marking (4"-6") 88,070 Lin Ft, and Solid Line Multi Comp Gr In (WR) (4-6") 52,230 Lin Ft.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents