Similar Projects
Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Road and Drainage Improvements
Infrastructure
Post-Bid
Blackshear, GA 31516

Southern Region Disaster Recovery Support BPA
Results

Resurfacing FY 2020
Results
Blackshear, GA 31516

GTIB Project - Bonneyman Road and Riverwoods Drive
Infrastructure
Post-Bid
Blackshear, GA

10.769 Miles of Milling, Resurfacing and Shoulder Rehabilitation at Various Locations
Results
GA

6.012 Miles of Widening, Resurfacing and Shoulder Rehabilitation on St Johns Church Rd (CR 349) Beginning at SR 121 and Extending US 84
Results
GA

TIA Band 1 Street Improvements
Results
Less than $1,000,000 est. value
Blackshear, GA 31516

Resurfacing, Rumble Strips, Sign Improvements
Results
Less than $50,000 est. value
GA

Polyethylene, Polymer and Metal Pipe
Term Contract
Results
Blackshear, GA

Installation of Box Culverts
Results
Less than $392,253 est. value
Blackshear, GA 31516

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

LMIG Street Resurfacing
Results
College Park, GA 30337

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

Last Updated 08/05/2021 09:13 AM
Project Title

CDBG-Sandy Bottom Neighbohood

Physical Address View project details and contacts
City, State (County) GA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $830,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all materials, labor, tools, equipment, and incidentals necessary for the installation of Street and Drainage Improvements in Pierce County, Georgia for the 2020 Community Development Block Grant The Scope of Work Includes: Street and Drainage Improvements to Satilla Trail, Pine Ridge Trail, Fox Squirrel Drive, Quail Trail, and Oakwood Bend in the Sandy Bottom Neighborhood.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents