Similar Projects
Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

Greenwood Stormwater Basin
Post-Bid
Niles, IL 60714

I-19-4476 Roadway and Bridge Widening and Reconstruction
Results
$25,000,000 to $50,000,000 est. value
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Replacement of 650 Ft. of Bikepath, Installation of Storm Sewer
Results
Bartlett, IL 60103

2021 Road Maintenance Program
Post-Bid
Inverness, IL

2021 Crack Routing and Sealing
Results
Hanover Park, IL

Street Resurfacing Program
Renovation
Post-Bid
Mount Prospect, IL

Grand Avenue Improvements
Renovation
Results
Chicago, IL 60600

Hilltop Elementary School Tennis Courts & Asphalt Paving
Post-Bid
Elgin, IL 60120

2021 Street Improvement Program
Results
Less than $464,820 est. value
Morton Grove, IL

Site Paving
Post-Bid
Elgin, IL 60120

Hart Road and Main Street Water Main Replacement
Results
Less than $563,165 est. value
Barrington, IL

2021 Paving Work at Conant, Fremd, Hoffman Estates, Palatine and Schaumburg High Schools
Post-Bid
Palatine, IL

Reported 07/08/2022 12:00 AM
Project Title

West Tank Yard Paving and Storm Sewer Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Burbank, IL   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $259,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Includes paving and storm sewer improvements at the West Tank Yard including, site excavation and grading, aggregate base course construction, combination concrete and gutter, P.C. Concrete Pavement, 8", bioretention facility construction, and all other appurtenant work. . Est. Value: $ 259,000.00.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents