Similar Projects
Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Major HVAC Repairs Bldg 5200 - Task Order 70Z0g120RPRV04300
Post-Bid
$1,000,000 to $1,250,000 est. value
Buzzards Bay, MA

Sandwich Water District Garage - Filed Sub Bids
Results
Less than $800,000 est. value
Sandwich, MA 02563

Sandwich Water District Pumping Station No. 12 - Filed Sub Bids
New Construction - 929 SF
Results
$1,400,000 est. value
Sandwich, MA

Replacement of CFAC Units
Post-Bid
Sagamore, MA 02561

Barnstable High School RTU Replacement Phase 1 Area C - Filed Sub Bids
Results
$1,300,000 est. value
Hyannis, MA 02601

Residential Weatherization Contractors
Post-Bid
Wareham, MA

Barnstable High School RTU Replacement Phase 1 Area C - General Bid
Results
$1,300,000 est. value
Hyannis, MA 02601

Replace Two Air Conditioning Condensers at 36 Harold Lane
Post-Bid
Less than $25,842 est. value
Chatham, MA 02633

Emergency Operations Training Center, Harrington Hall - Filed Sub-Bids
Results
Less than $1,000,000 est. value
Buzzards Bay, MA 02532

Air Conditioner Condensing Unit Replacement - Provincetown Municipal Airport
Post-Bid
Provincetown, MA 02657

General Plumbing/HVACServices
Term Contract
Results
Hyannis, MA

Spbn 202020 Design Services for HVAC Upgrades in B164 and B162
Post-Bid
Bourne, MA

Heating Renovations at East Falmouth School - Filed Sub-Bids
Results
Less than $450,000 est. value
Falmouth, MA 02536

Commsta Boston Heat Pump
Post-Bid
Buzzards Bay, MA

Last Updated 02/11/2021 02:21 PM
Project Title

Split Ductless AC Repair and Relocation

Physical Address View project details and contacts
City, State (County) Woods Hole, MA   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Original Set Aside: Partial Small Business Set-Aside (FAR 19.5). Vendor is to move the HVAC units labeled 1, 2, &3 (drawing two) from the Administration building rooftop to the south side mechanical mezzanine. Work shall include running new refrigerant piping to the Sector Command Center HVAC cassette heads, the Information Technology Server Room, and install a ceiling cassette in the future Rescue 21 room outside of our Command Center.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents