Last Updated 02/10/2021 04:09 AM
Project Title

Water Distribution, Wastewater Collection, Storm Water Facilities and Paving to Serve Cane Island, Section Thirty Three and Oak Grove Trail Phase 3

Physical Address View project details and contacts
City, State (County) TX   (Waller County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of approximately 1,671 LF of 6”-12” PVC waterline; 1,584 LF of 8”-12” PVC gravity sanitary sewer; 1,700 LF of 24”-60” RCP storm sewer; 5,030 SY of 6” reinforced concrete pavement; and 2,480 SY of 7” reinforced concrete pavement.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents