Similar Projects
Midas Creek Asphalt Trail and Pedestrian Bridge
New Construction, Infrastructure
Bidding
South Jordan, UT 84095

US - 89 Victory Road to Davis Co Line
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
Salt Lake City, UT 84103

2020 Shoulder Improvements
Post-Bid
Sandy, UT 84070

Highland Drive Widening and Reconstruction
Post-Bid
Draper, UT 84020

Sandy City 2020 Overlay Project
Results
Sandy, UT 84070

Mill and Overlay 2020 Project
Results
Murray, UT 84123

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Bidding

2020 Trails Pavement Maintenance Project
Post-Bid
Draper, UT 84020

Relocation of Gates 10 and 11
Results
Salt Lake City, UT

SLCo Sam's Blvd Overlay
Infrastructure
Bidding
$920,000 to $1,380,000 est. value
Kearns, UT 84118

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

I-215; Various Locations Preservation - Roadway
Results
$500,000 to $1,500,000 est. value
UT

SR-65 Gate to Morgan Co Line
Infrastructure
Bidding
Salt Lake City, UT

Chip Seal Type II Project
Post-Bid
UT

Reported 09/18/2021 12:00 AM
Project Title

Murray Mill and Overlay 2021

Physical Address View project details and contacts
City, State (County) Murray, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate - 08/23/21
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes five payment schedules of collector roads with 2” rotomilling and placement of 3” bituminous concrete pavement. The total quantities are estimated at 617, 000 SF of mill and 11,569 Tons of bituminous overlay. Also included are pedestrian ramp improvements, limited curb and gutter replacement and sidewalk/pedestrian improvements.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents