Similar Projects
Big Bend over I-44
New Construction, Infrastructure
Bidding
Crestwood, MO 63126

Muegge Road
New Construction, Infrastructure
Bidding
Saint Charles, MO 63302

Spanish Pond ADA Improvements
New Construction
Post-Bid
MO 63138

11th Street over Corby Parkway Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO 64504

Buckner Tarsney Road Bridge Replacement North of Ryan Road
Results
Independence, MO

Highway N Bridge Repairs at Dardenne Creek Repairs
Results
Cottleville, MO

Callaway County Replacement Bridge No. 4440016
New Construction, Infrastructure
Bidding
Fulton, MO

Clay County Bridge Replacement
New Construction
Post-Bid
Liberty, MO

Washington County Bridge Replacement
Results
Potosi, MO

Bridge Deck Replacement
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value

King Hill Bridge Replacement
New Construction
Post-Bid
Saint Joseph, MO

2021 Bridge Deck Sealing
New Construction
Results
Wildwood, MO

Bridge Rehabilitation
New Construction, Infrastructure
Bidding
$50,000 to $100,000 est. value
MO

22nd Street Over Corby Parkway Bridge Replacement
New Construction, Infrastructure
Post-Bid
Saint Joseph, MO 64504

Highland Pedestrian Bridge
New Construction
Results
Saint Joseph, MO

Reported 09/17/2021 12:00 AM
Project Title

Boeuf Creek Road Bridge over a Tributary to Boeuf Creek

Physical Address View project details and contacts
City, State (County) MO   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All work and materials including grading, paving, and constructing the new bridge. A one-span, 65-foot-longpre-stressed concrete spread box beam bridge over a Tributary to Boeuf Creek. The bridge will havea 28'-0" clear roadway width with Type H curbs and a cast-in-place concrete deck on precast prestressedpanels. Concrete pile cap integral end bents will be supported by steel piles driven to rock. Approach pavement will be 28'-0" wide except at tapered ends to meet existing pavement width, together with anyincidental work on the above project. The total length of the federally funded improvements is 450 feet. The project is located in rural northwestern Franklin County off Boeuf Creek Road approximately 4 miles southeast of New Haven, Missouri and 2.3 miles southwest of State Route 100 intersection with Highway KK.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents