Similar Projects
USCG Replace Lintels on Hamilton Hall, U.S. Coast Guard Academy, New London, CT
Renovation
Results
$750,000 to $1,000,000 est. value
New London, CT 06320

Design-Build/Design-Bid-Build, Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for General Construction Services at PWD NAVSUBASE New London, Connecticut and PWD NS Newport, Rhode Island Area of Responsibility
New Construction
Post-Bid
$500,000 to $5,000,000 est. value
New London, CT

Repair Failing (CI58) Submarine A School Building 488, New London, CT
New Construction - 109,442 SF
Results
$25,000,000 to $100,000,000 est. value
New London, CT

Armory Repairs - Bridge/Drill Shed
Renovation - 1,200 SF
Results
$350,000 to $375,000 est. value
Hartford, CT 06106

Camp Nett Building at 801 Latrine Renovations
Renovation
Results
East Lyme, CT 06357

USCG D/B Install OCS Laundry Room Chase Hall Annex E, USCG Academy
Renovation
Results
$100,000 to $250,000 est. value
New London, CT 06320

Last Updated 01/26/2022 12:51 PM
Project Title

AASF Window Replacement

Physical Address View project details and contacts
City, State (County) Hartford, Windsor Locks, CT 06096   (Hartford County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 to $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing windows on Building 152, Building 157 and Building 200 and furnish and install blast resistant window systems. Remove existing storefront system on Building 157 and install a blast resistant storefront system. Removal of the existing window air conditioning unit in Building 200 and install a ductless split air conditioning system.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents