Similar Projects
Corte Madera Creek Flood Management Project - Zone 9 - Marin County
Infrastructure
Conception
$9,750,000 CJ est. value
San Rafael, CA 94901

Lower Las Gallinas Creek Dredge CSA 6 Santa Venetia - Marin County
Infrastructure
Conception
$2,200,000 CJ est. value
San Rafael, CA 94901

North Bay Children’s Center facilities
Demolition, New Construction, Infrastructure - 32,339 SF
Design
$9,200,000 CJ est. value
Novato, CA 94949

San Rafael Inn
Demolition, New Construction, Infrastructure - 44,485 SF
Design
$9,630,000 CJ est. value
San Rafael, CA 94901

The Neighborhood at Los Gamos
New Construction, Infrastructure - 5,500 SF
Post-Bid
$69,000,000 CJ est. value
San Rafael, CA 94903

RFP Engineering - Hart Street Connector
Infrastructure
Post-Bid
$125,000 to $150,000 est. value
Corte Madera, CA 94925

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Place Polyester Concrete Overlay, Place HMA, Cold Plane AC Pavement
Infrastructure
Results
$2,540,000 est. value
CA

College of Marin Learning Resource Center Increment #2 - Site Development
Infrastructure
Construction
$63,000,000 CJ est. value
Kentfield, CA 94904

Vivian Street Multi-Residential / San Rafael
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Vivian Street Multi-Residential / San Rafael
New Construction, Infrastructure
Pending Verification
$26,000,000 CJ est. value
San Rafael, CA 94901

Southern Heights Boulevard at Courtright Road Retaining Wall - 206.14 - City of San Rafael
Renovation, Infrastructure
Conception
$800,000 CJ est. value
San Rafael, CA 94901

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Ross Common Pathway Project
Infrastructure
Post-Bid
$275,000 CJ est. value
Ross, CA 94957

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

Last Updated 10/17/2023 08:36 AM
Project Title

Diablo Avenue/De Long Avenue Corridor Enhancements

Physical Address View project details and contacts
City, State (County) Novato, CA 94945   (Marin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $699,135 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000328638 The work to be done includes but is not limited to: safety improvements on Diablo Avenue/DeLong Avenue corridor between Novato Boulevard and Reichert Avenue in the City of Novato, Marin County. The proposed work entails new roadway signage, striping, and minor concrete-curb work to calm arterial traffic, improve pedestrian access by shortening pedestrian crossing distances, and increase the visibility of traffic signals. Curb ramps will be upgraded to current ADA standards. All work will be within the existing City right of way. The DBE Contract goal is 21% percent. THIS PROJECT IS SUBJECT TO THE "BUY AMERICA" PROVISIONS OF THE SURFACE TRANSPORTATION ASSISTANCE ACT OF 1982 AS AMENDED BY THE INTERMODAL SURFACE TRANSPORTATION EFFICIENCY ACT OF 1991. Engineer's Estimate of construction cost is $800,000. For any additional information or technical questions please contact Gosia Woodfin, Project Engineer, at (415) 899-8997 or gwoodfin@novato.org. Bid Intent Not Available Question Acceptance Deadline 09/14/2023 05:00 PM PDT Questions are submitted online Yes Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Federally Funded - Insurance Required - License Required - Material Safety Data Sheets Required - Required No bid will be received unless it is made on proposal forms furnished by the City Engineer. Each proposal must be accompanied by a certified or cashier's check or bid bond in the amount of ten percent (10%) of the estimated aggregate amount of the bid as a guarantee that the bidder, if the award is made to him/her in accordance with the terms of his/her proposal, will promptly execute a contract in the required form, secure payment of worker's compensation insurance, and furnish a satisfactory, faithful performance bond and a labor and material bond. Each of said bonds shall be in the sum of not less than one hundred percent (100%) of the estimated aggregate amount of the payments to be made under the contract computed on the basis of the price stated in the proposal. **The City reserves the right to reject any and all bids, to waive any informality in a bid, and to make award as the interests of the City may require. This notice is given by order of the City Council of the City of Novato, California. Time for Completion - 40 Working Days

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents