Last Updated | 02/27/2023 05:04 PM |
Project Title | Replace King Center HVAC Systems - Side Stream Filtration Replacement & Tivoli Student Union Side Stream Filtration Replacement |
Physical Address | View project details and contacts |
City, State (County) | Denver, CO 80202 (Denver County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $70,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Documented Quote is to replace two side-stream filtration devices on cooling towers on the AHEC campus, one in the King Center and the second in the Tivoli Student Union Building. As an attachment to the Documented Quote form, firms must list each building and the lump sum cost for labor and materials for each (as separate line items). Costs will be listed separately for each building on the issued Purchase Order and should be billed separately. Ideally, the work will happen concurrently, so contractor must be prepared to staff both projects. Heating, air conditioning, and ventilation maintenance. Estimated Construction Cost: $30,000 (King Center) & $40,000 (Tivoli). Questions Due February 10, 2023 at 5:00PM Provide and install new Lakos (or approved equal) side stream filtration device in room P200H per manufacturer's instructions a. Qty (1) LAKOS Model TCI-0280 TowerClean Packaged Separator System. b. Skid mounted filter system with Model ILB-0350 Centrifugal Separator and c. 10 HP, 460 volt / 3 phase pump motor. d. Duty: 280 gpm e. Inlet and Outlet Connection: 4.0" f. Weight: 700 lbs g. Flooded suction required on pump h. Automatic Purge Valve with Timer. 2. Disconnect existing Lakos filtration system a. Disconnect and safe-off electrical for re-use b. Isolate and disconnect condenser water piping 3. Remove and disposed of existing Lakos Filtration System 4. Rig or crane new side stream filtration to rooftop and into enclosure 5. Reconfigure and reconnect condenser water piping, valves and mechanical connections as needed 6. Reconnect electrical to new side-stream filter system 7. Perform start-up training with AHEC HVAC staff. A walk of the project location will commence after a brief overview of the project. AHEC-23916-D, AHEC-23917-D, AHEC-23918-D, AHEC-23919-D |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |