Similar Projects
Mt Bighorn Warman Loop Road
Term Contract
Design
MT

Y--GAOA Stellar Creek Road Repair
Term Contract
Design
$500,000 to $1,000,000 est. value
Forsyth, MT 59327

Pistol Range, Parking & Road Improvements
Alteration
Post-Bid
Billings, MT

HRDC Community First Griffin Place Site and Infrastructure
Demolition, Infrastructure
Post-Bid

Headwaters Trail System Jefferson Street Connection - 2021
Infrastructure
Results
Three Forks, MT 59752

Silver Bow Creek Greenway Cattle Bridge - Greenway Service District
New Construction, Infrastructure, Alteration
Results
Ramsay, MT

Grading, Gravel, PMS Surfacing, Drainage, Rumble Strips, Fencing and Pavement Markings on the SF 169 Fairfield Curve Improvements
Infrastructure
Post-Bid
MT

2021 Water System Improvements
Infrastructure, Alteration
Results
$4,051,000 est. value
Bigfork, MT 59911

Cold Milling, Cold Central Plant Recycle or Pulverization, PMS Overlay, Bridge Deck Repairs, Seal
Infrastructure
Post-Bid
MT

2011-00141 BIA Route #0073 Improvements - Phase III
Infrastructure
Results
MT

Chip Seal Scrub Seal Vaughn To Dutton Great Falls Area
Infrastructure
Post-Bid
Dutton, MT

Headwaters Trail System Crack Seal and Seal Coat - 2021
Infrastructure
Results
Three Forks, MT 59752

Chip Seal E Frontage Road SE Of Dutton Airport Great Falls Area
Infrastructure
Post-Bid
Belgrade, MT 59714

Hudson Bay Divide South
Infrastructure
Results

Removal and Replacement of Road and Parking AC Pavement in Riverfront Park
Infrastructure
Post-Bid
Billings, MT

Reported 03/16/2022 12:00 AM
Project Title

GAOA Custer Gallatin National Forest - Main Fork Rock Creek Road #2421 Reconstruction Project

Physical Address View project details and contacts
City, State (County) Red Lodge, MT   (Carbon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Please read all solicitation documents carefully. This project consists of reconditioning and surfacing approximately 4.27 miles of the Main Fork Rock Creek Road #2421 including the trailheads, turnouts, and road and camp approaches along the roadway starting at MP 4.36 to the terminus at Glacier Lake Trailhead. The work includes culvert removal and replacement, traffic control, and various other items related to the road work on the Main Fork Rock Creek Road #2421. Also includes boulder rock placement at staked locations along the entire length of the road as staked in the field. The trailhead and access at MK Campground will also be reconditioned and surfaced under this project. A parking area and access will be constructed with time and equipment near the intersection of #2421 Main Fork Rock Creek and #2004 Hell Roaring Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents