Similar Projects
Last Updated | 01/10/2023 02:35 PM |
Project Title | New Caseyville Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Caseyville, IL 62232 (Saint Clair County) |
Category(s) | Education, Government/Public, Heavy and Highway |
Sub-Category(s) | Elementary School, Library - Public, Site Development |
Contracting Method | Construction Management - CM at Risk, Competitive Bids |
Project Status | Construction Commenced, Construction start expected January 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $20,000,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Construction Manager, Holland Construction Services, Inc., on behalf of the Collinsville CUSD #10 will receive sealed bids for construction of the New Caseyville Elementary School. Work involves construction of the new 2-story Caseyville Elementary School Building comprised of academic wings, secure entry, and storm shelter as well as construction of a 1-story standalone Public Library. Bids will be received for the following bid packages. See specific Scope of Work for specification inclusion and responsibility. Generally, the work may be described as follows: 1. Bid Package No. 1 Earthwork / Storm Sewer 2. Bid Package No. 2 Landscaping 3. Bid Package No. 3 Asphalt Paving 4. Bid Package No. 4 Site Concrete 5. Bid Package No. 5 Structural Concrete / Building Flatwork Concrete 6. Bid Package No. 6 Precast Concrete 7. Bid Package No. 7 Masonry 8. Bid Package No. 8 Structural Steel 9. Bid Package No. 9 General Trades / Carpentry 10. Bid Package No. 10 Roofing / Sheet Metal / Metal Panels 11. Bid Package No. 11 Aluminum Storefront 12. Bid Package No. 12 Metal Stud / Drywall / ACT Ceilings 13. Bid Package No. 13 Painting 14. Bid Package No. 14 Flooring 15. Bid Package No. 15 Resinous Flooring 16. Bid Package No. 16 Sports Flooring 17. Bid Package No. 17 Athletic Equipment 18. Bid Package No. 18 Gym Bleachers 19. Bid Package No. 19 Lockers 20. Bid Package No. 20 Elevator 21. Bid Package No. 21 Food Service Equipment 22. Bid Package No. 22 Sprinkler Work 23. Bid Package No. 23 Plumbing Work / Site Water / Site Sanitary Sewer 24. Bid Package No. 24 HVAC Work 25. Bid Package No. 25 Electrical Work A Bid Bond or Certified Check made payable to Collinsville CUSD #10 in the amount of 5% of the Base Bid shall accompany the Bid as a guarantee that the bidder, if awarded the contract, will execute the contract, and proceed with the work. Should a bidder find discrepancies, ambiguities, and/or omissions for the Contract Documents, or be in doubt of their meaning, bidder shall at once, and in any event no later than Friday, September 30, 2022, at 5:00 pm central time, notify the CM by completing the Request for Clarification form. All RFCs shall be sent to Holland Construction Services. As of January 10, 2023, site work has begun. Construction is anticipated to be complete summer 2024. |
||||||||||||||||||||||||||||||||||||||||||
Details | 2 Stories Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |