Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

2022 Pavement Preservation Project
Infrastructure
Bidding
$500,000 est. value
Portland, OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Wilson Avenue Corridor Project - Construction Manager/General Contractor
Infrastructure, Alteration
Post-Bid
Bend, OR

US 20 - Safety Upgrades (Albany to Corvallis) Albany - Corvallis Highway
Infrastructure
Results
Corvallis, OR 97333

NW 9th - NW Hoyt Street System Improvements - CM/GC
Infrastructure
Post-Bid
OR 97209

US20 - Warm Springs Road - Harer Junction Section Central Oregon Highway
Infrastructure
Results
$10,000,000 to $20,000,000 est. value

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

Last Updated 05/26/2022 02:40 AM
Project Title

Everett and State Roadway Improvements

Physical Address View project details and contacts
City, State (County) Sutherlin, OR   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $331,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work generally consists of furnishing all labor, equipment, materials and supervision for the removal and reconstruction of curb, gutter, sidewalk, and asphalt pavement on Everett Avenue between HWY 99 and State Street and State Street between Central and Sutherlin Creek, 7 new accessible ramps, 180+- feet of 12-inch storm sewer; other additional and incidental work as called for by the plans and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents