Similar Projects
Asphalt Overlay
Infrastructure
Bidding
$920,940 CJ est. value
Clinton, IA 52732

Asphalt Overlay
Infrastructure
Bidding
$920,940 CJ est. value
Clinton, IA 52732

Structures Demolition Phase I
Infrastructure
Post-Bid
Clinton, IA 52732

700 blocks South 3rd Street and South 4th Street Reconstruction
Infrastructure
Post-Bid
Clinton, IA 52732

Fog Seal
Infrastructure
Results
IA

South 8th Street Sewer Separation
Infrastructure
Results
$1,014,200 est. value
Clinton, IA 52732

HMA Resurfacing / Heater Scarification
Infrastructure
Bidding
$1,500,000 CJ est. value
Calamus, IA 52729

2022 Parking Lot Improvement Project
Infrastructure
Post-Bid
$400,000 est. value
Clinton, IA 52732

South 10th Street Sewer Separation
Infrastructure
Results
Clinton, IA 52732

8th Avenue South Sewer Separation
Infrastructure
Bidding
$500,000 CJ est. value
Clinton, IA 52732

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

South Clinton Sewer Separation
Infrastructure
Results
IA

Riverview Skate Park Improvements Project: Specialty Work
Infrastructure
Post-Bid
$522,024 CJ est. value
Clinton, IA 52732

PCC Patching
Infrastructure
Results

Phase 3 - Addition & Renovation Camanche High School
Addition, Build-out, Renovation, Infrastructure
Post-Bid
$11,753,037 CJ est. value
Camanche, IA 52730

Last Updated 03/20/2023 02:35 PM
Project Title

Camanche 9th Street Reconstruction

Physical Address View project details and contacts
City, State (County) Camanche, IA 52730   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,207,396 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

ROADWAY RECONSTRUCTION OF APPROXIMATELY 0.58 MILES OF 9TH STREET IN CAMANCHE FROM HIGHWAY 67 TO EAST OF 19TH AVENUE WITH CURB AND GUTTER, STORM SEWER, AND OTHER APPLICABLE IMPROVEMENTS. THE PROJECT INCLUDES ALTERNATE PAVEMENT OPTIONS OF HOT-MIX ASPHALT AND PORTLAND CEMENT CONCRETE.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents