Similar Projects
Secondary Water Filter Modifications
Bidding
Payson, UT 84651

Mapleton City Street Rehabilitation Project 2021
Bidding
Mapleton, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Spanish Fork Ne Irrigation Pipeline
Results
Spanish Fork, UT

800 South Waterline Replacement Project
Results
Less than $305,140 est. value
Alpine, UT 84004

Pressurized Irrigation Metering Project
Post-Bid
Lehi, UT 84043

State Street Water Line 470 West - 200 West
Results
Less than $500,000 est. value
American Fork, UT

West Access Road and Waterline Improvements
Post-Bid
Eagle Mountain, UT 84005

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Pole Canyon Water Line and Force Main Sewer
Post-Bid
Eagle Mountain, UT

Spanish Fork Jr High Transportation Corridor Phase 1
Results
Less than $1,600,000 est. value
Spanish Fork, UT 84660

Pre-construction design assistance and Construction Services for Waterline Replacement
Post-Bid
Woodland Hills, UT 84653

PRV Project
Results
Less than $441,000 est. value
Pleasant Grove, UT 84062

2020 2000 South PRV Project
Post-Bid
Orem, UT 84058

Last Updated 11/12/2020 01:07 PM
Project Title

200 South Water Main Improvements

Physical Address View project details and contacts
City, State (County) American Fork, UT 84003   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000 to $3,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct approximately 6,600 total linear feet of ductile iron water main in 200 South from Mill Pond Road to 1100 West and from 900 West to 300 West. Also connect to existing water lines at each intersection. Work includes excavation, backfilling, and pavement restoration, and installing service connections, fire hydrants, air vacs, blow offs, valves, and fittings as shown in the project drawings. Work also includes jacking and boring a 42-inch steel casing approximately 150 feet long under the existing railroad tracks, which must be coordinated with UTA and UPRR.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents