Similar Projects
SR-154 Over 3600 W Deck Preservation (0C-815)
Bidding
$500,000 to $1,500,000 est. value
UT

FA-2234; Magna Bridge Replacments, 035031F 035033F
Post-Bid
$500,000 to $1,500,000 est. value
UT

Little Valley Road Bridge Replacement Project
Post-Bid
Heber, UT 84032

Mud Creek and Winter Quarters Creek Road and Bridge Abutment Construction Project
Results
Price, UT

Construction of Two (2) Bridges
Results
Cedar City, UT 84720

River Bridge Event Center
New Construction - 7,615 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Spanish Fork, UT

Bridge Deck Repair on I-15
Post-Bid
Cedar City, UT 84720

US-191; North Moab to Colorado River Bridge
Results
$15,000,000 to $20,000,000 est. value
UT

Recapture Creek Bridge - 037004C
Post-Bid
$500,000 to $1,500,000 est. value
UT

Red Butte Garden Upper Creekside Walk Bridges Trail
Results
Less than $1,068,315 est. value
Salt Lake City, UT 84108

Mcelmo Creek Bridge - 037012C
Post-Bid
$1,500,000 to $3,000,000 est. value
UT

Foothill VMS; Southbound Traveler Information
Results
Less than $500,000 est. value
UT

West Cache Canal Screening Project
Post-Bid

State Street Pedestrian Bridge Removal
Results
Murray, UT 84107

UDOT Bridge Maintenance Avl
Term Contract
Post-Bid
West Valley City, UT

Last Updated 07/09/2020 03:16 PM
Project Title

Z--Zion 274111 - Bridge Preservation, Zion National Park

Physical Address View project details and contacts
City, State (County) Springdale, UT 84767   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: The purpose of this project is to rehabilitate two steel multi-girder bridges and two tunnel structures and associated areas at Zion National Park. Repairs for the bridges include the repair of a bearing seat, stabilizing erosion at abutments, painting steel beams, bridge deck repairs, installing new wooden guardrail, paving and striping on deck and approaches, cleaning and resealing deck expansion joints. Repairs for the tunnels include removal of possible loose rock over the portals, installation of a guardrail system at the portals, repair of spalls in shotcrete lining, repair of longitudinal cracking and spalling of the concrete pavement, repair of minor collision damage to the lining and ribs, and providing new pavement striping and reflectors. The project will choose one construction contractor for the bridge and tunnel work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents