Similar Projects
Last Updated | 11/19/2021 01:45 PM |
Project Title | Mill Levy 16A and 17A Traffic Signals Construction |
Physical Address | View project details and contacts |
City, State (County) | Denver, CO 80238 (Denver County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,100,000 to $2,700,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This is the 2019-2021 Traffic Signal Upgrade - Mill Levy 16A and Mill Levy 17A Project. The overall objective of this project is the reconstruction of six (6) traffic signals and installation of one (1) new signal within the City and County of Denver - total seven (7) traffic signals. The locations of these traffic signals are at the following intersections: 1.14th Ave and Clarkson St. 2. 14th Ave and Washington St. 3. 14th Ave and Pearl St. 4. 13th Ave and Clarkson St. 5. 13th Ave and Corona St. 6. 13th Ave and Downing St. 7. 20th Ave and Downing St (new). In addition to the traffic signal upgrades, there will be improvements made to curb ramps, sidewalk, curb and gutters, curb returns, and damaged sidewalks, and curb and gutter at each intersection for enhanced pedestrian access. Ramp improvements will be constructed to current CCD standards and specifications. In addition, there are existing storm sewer inlets and manholes at the intersections requiring relocation or resetting. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |