Similar Projects
Dunbar Creek Flood Protection Project
Bidding
$500,000 to $1,000,000 est. value
Dunbar, PA 15431

Culvert Contract
Post-Bid
Northumberland, PA

Culvert Pipe
Post-Bid
PA

AMR McGarey South
Results
PA

AMR, Little Bear Creek East
Results
PA

Structure Replacement of a Culvert
Post-Bid
PA

West Ore Street Drainage Improvements
Results
Less than $75,000 est. value
Loganville, PA

Frosty Hollow Road Culvert Replacement Project
Post-Bid
Woodbury, PA

The Replacement of a Culvert on Erickson Road
Results
Ulysses, PA 16948

7,653 LF 6 Inch Pipe Underdrain, Installed
Post-Bid
PA

2018 Union Township Drainage Improvements Project
Results
Finleyville, PA

Reese Road Culvert Replacement and Haines Road Culvert Replacement
Post-Bid
Buffalo, PA

Green Park Basin BMP Retrofit
Results
$130,000 to $140,000 est. value
Manheim, PA 17545

Carrie Furnace Redevelopment Project - Stormwater Basin Modification
Post-Bid
PA

Meadow Brook - Flood Control
Results
Less than $6,210,000 est. value
Meadowbrook, PA

Last Updated 02/11/2019 07:50 AM
Project Title

North Line Street Culvert Replacement

Physical Address View project details and contacts
City, State (County) Hatfield, PA 19440   (Bucks County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Removal of an existing 48 IN RCP/Dual 36 IN CMP culvert, including end section and inlets, Installation of 129 L.F. of 83" x 57" corrugated steel pipe (CSP) arch, a flared end section, 27 L.F. of 3' x 10' concrete box culvert, and 18 L.F. of 48" HDPE. Also included is the installation of two large junction boxes with Type "C" inlet tops, 67 L.F. of concrete curb, 10 S.Y. of sidewalk, 23 L.F. of depressed concrete curb, sanitary doghouse manhole, 21 L.F. of DIP sanitary sewer with concrete encasement and installation of R-7 rip rap apron. Construction will occur in Township roads and easement areas and will include all required demolition and restoration work along with provisions for all necessary erosion and sedimentation controls. In addition, the project includes an alternate/add-on item that will be considered by the Township during review of bid proposals. A potential alternate/add-on involves the removal of an existing 48" diameter "DW" headwall and the furnishing and installation of a new 48" diameter "DW" headwall.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents