Similar Projects
Last Updated | 02/02/2023 05:35 AM |
Project Title | Water Reclamation Facility |
Physical Address | View project details and contacts |
City, State (County) | Ixonia, WI 53036 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Plumbing |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $15,627,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of this Contract is generally described as general construction of wastewater treatment facility buildings and basins including sitework, yard piping, structural, architectural, process piping and equipment, plumbing, heating, ventilation, air conditioning, electrical, and instrumentation and control. The Project consists of constructing: Structure 300: Selector Structure - Three mixed selectors with influent junction box and effluent channel. Structure 400: Oxidation Ditch - Two ring oxidation ditch Structure 500: Plant Drain Pump Station Structure 610: Secondary Clarifier No. 1 - Circular clarifier to settle out biomass and collect biomass for return to the selector/oxidation ditch bioreactors to perform additional treatment. Structure 700: Process Building - Structure consisting of sludge pumping, UV disinfection equipment, and chemical dosing equipment. Structure 800: Biosolids Pump Building - Structure housing biosolids pump. Structure 810: Biosolids Storage - Tank for storage and mixing of biosolids. Structure 900: Administration Building - Structure consisting of office space, lab equipment, and garage space. New Outfall on Rock River Site piping and utilities Bid Alternate 1A - Oxidation Ditch 3rd Ring Structure Only Bid Alternate 1B - Oxidation Ditch Operational 3rd Ring Bid Alternate 2 - Second Clarifier (Structures 600 and 620) Bid Alternate 3 - Tertiary Filters Bid Alternate 4 - Vactor Truck Receiving Station (Structure 510) Bid Alternate 5 - Biosolids Storage Tank Cover Bid Alternate 6 - Launder Covers on Structure 610 Bid Alternate 7 - Launder Covers on Structure 620 The Work will be substantially completed on or before February 28, 2025, Final Completion- April 30, 2025 Questions regarding the bid documents should be directed to Donohue & Associates attention: Kim Gahagan, PE (Telephone 920-803-7310, email kgahagan@donohue-associates.com.) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |