Similar Projects
Leeds Parkway Drive Pump Station SSO Abatement
New Construction
Bidding
$6,900,000 to $7,400,000 est. value
Leeds, AL

Proposed Booster Pump Station & Water Line Improvements
New Construction
Bidding
$1,500,000 est. value
Smiths Station, AL

Morgan Road Bypass Lift Station Reconstruction
Post-Bid
$200,000 to $205,000 est. value
Camden, AL 36726

Remlap - Pine Mountain Water Authority Booster Station
Post-Bid
Remlap, AL 35133

Duck River Reservoir Phase II - Raw Water Pump Station
Results
Less than $10,590,800 est. value
Cullman, AL 35055

Eslava Lift Station Bar Screen Replacement
Results
Mobile, AL

West Catoma Pump Station (102A) Improvements
Bidding
Montgomery, AL

Lift Station and Oil Water Separator Repair
Post-Bid
$500,000 to $1,000,000 est. value
Montgomery, AL 36108

Alabama Highway 21 Sewer Pump Station and Force Main
Results
Talladega, AL 35160

Watercress Lift Station and Force Main
Bidding
Athens, AL

Glass-Fused-to-Steel (GFS) Bolted Ground Water Storage Tank and Booster Station Improvements
Post-Bid
Blountsville, AL 35031

Improvements to the Lakewood Pump Station
Results
Less than $679,675 est. value
Dothan, AL 36303

New Industrial Area Booster Pump Station
Post-Bid
Decatur, AL 35609

Heathrow Lift Station Improvements
Results
Florence, AL 35630

New Pumping Station (Contract C)
Post-Bid
Irvington, AL 36544

Reported 09/18/2020 12:00 AM
Project Title

Rehabilitation of Pumping Station No. 2

Physical Address View project details and contacts
City, State (County) Samson, AL   (Geneva County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $110,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The rehabilitation of Pumping Station No. 2 located at Samson wastewater treatment plant, to include but not limited to, bypass pumping, removal of existing pumps, piping, concrete slab, installation of new pumps, rails, piping, electrical and all appurtenances necessary to complete the rehabilitation of the existing pumping station.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents