Similar Projects
Murphy USA #7010 / Ennis
New Construction, Infrastructure - 1,400 SF
Conception
$1,500,000 CJ est. value
Ennis, TX 75119

Buie Professional Building
New Construction, Infrastructure - 4,500 SF
Design
$850,000 CJ est. value
Midlothian, TX 76065

1215 Crossing Apartments
New Construction, Infrastructure - 229,800 SF
Design
$10,000,000 CJ est. value
Glenn Heights, TX 75154

Auger Water Treatment Plant Expansion to 24 MGD
Renovation, Infrastructure
Bidding
$22,000,000 CJ est. value
Midlothian, TX 76065

Auger Water Treatment Plant Expansion to 24 MGD
Renovation, Infrastructure
Bidding
$22,000,000 CJ est. value
Midlothian, TX 76065

Grading Operations to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

Grading Operations to Serve Prairie Ridge Phase 6
Infrastructure
Post-Bid
TX

Excavation Improvements for Bridgewater, Phase 1A
Infrastructure
Results
Midlothian, TX

Excavation Improvements for Bridgewater, Phase 1B
Infrastructure
Results
Midlothian, TX

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

Timco Logistics Office & Truck Maintenance Building
New Construction, Infrastructure - 32,272 SF
Pending Verification
$6,500,000 CJ est. value
Waxahachie, TX 75167

AutoZone #5757 / Ferris
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Ferris, TX 75125

Red Oak Academy
New Construction, Infrastructure - 7,055 SF
Bidding
$1,500,000 CJ est. value
Red Oak, TX 75154

Grading Operations to Serve Prairie Ridge Major Infrastructure
Infrastructure
Post-Bid
TX

Waxahachie Carport Enclosure
Infrastructure
Results
$19,908 CJ est. value
Waxahachie, TX 75165

Last Updated 09/09/2022 10:03 AM
Project Title

Mountain Creek Regional Wastewater System Expansion from 4.5 MGD to 6.0 MGD

Physical Address View project details and contacts
City, State (County) Midlothian, TX 76065   (Ellis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes, but is not limited to, the following major work items: Construction of new influent pump station and headworks facility. Expansion of existing filter facility and construction of new UV disinfection facility. Construction of new sludge holding tanks and solids dewatering facility. Electrical and site improvements required for implementation of the work above. The deadline to ask questions is 7/14/2022 2:00 PM CDT 20213058.001A, 3510.2018, 4180319

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents