Similar Projects
Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Playground Engineered Wood Fiber Installation
Post-Bid
Greeley, CO 80631

Coalridge Neighborhood Park Renovation
Post-Bid
Frederick, CO 80530

Koshio Park Renovation
Renovation
Results
Less than $250,000 est. value
Fort Lupton, CO

Village Park Tennis Court Replacement
Results
$150,000 to $200,000 est. value
Evans, CO 80620

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Construction
Less than $5,350,000 est. value
Erie, CO 80516

Redtail Ranch Master Planned Community
New Construction
Pending Verification
Erie, CO 80516

2020 Park Amenities Bid
Post-Bid
Frederick, CO 80530

Foxhill Park Project
Results
$350,000 to $375,000 est. value

Playground Surface Repair - Martinez Elementary School
Post-Bid
Greeley, CO 80631

Centennial Park Improvements - Phase 0.5
Results
$209,530 to $336,144 est. value
Greeley, CO 80631

Outdoor Fitness Area Demo and Build
New Construction
Post-Bid
Firestone, CO

Centennial Park Improvements Design Build
Results
Less than $200,000 est. value
Frederick, CO 80530

Highland Apartments
New Construction
Post-Bid
Longmont, CO 80504

Reported 05/26/2021 12:00 AM
Project Title

Willow Bend Community

Physical Address View project details and contacts
City, State (County) Fort Lupton, CO 80621   (Weld County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Clubhouse/Social Club, Manufactured Homes, Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

449 Manufactured Homes, Clubhouse/Social Club, Park/Playground, New Construction, 127 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Fabricated Engineered Structures, Fabricated Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents